
8
|
Piping installation
Installer reference guide
116
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
8.6.5 To fill the heating system
DANGER: RISK OF ELECTROCUTION
During the filling process, water can escape from any leaking point and can cause an
electrical shock if it comes into contact with live parts.
▪
Before the filling process, de-energise the unit.
▪
After the first filling and before switching on the unit with the mains switch, check
whether all electric parts and connection points are dry.
1
Connect a hose with a non-return valve (1/2") and an external manometer
(field supply) to a water tap and the fill and drain valve. Secure the hose
against slipping off.
j/k
e.1
B
AB
A
e.2
50%
(45%)
100%
0%
CH
Bypass
(B)
(A)
f
a
h
i
c j
k
d
b
g
50% (67%)
100%
0%
CH
DHW
(A)
(B)
a
Hose with a non-return valve (1/2") and an external manometer (field supply)
b
Fill and drain valve
c
Space heating/cooling water OUT
d
Space heating/cooling water IN
e.1
Valve motor
e.2
Valve motor latch
f
Water tap
g
Automatic air purge valve
h
Pressure gauge (field supply)
i
Pressure vessel (field supply)
j
Bypass valve
k
Tank valve
2
Prepare for air purging according to the instructions (see
of the unit with the manual air vent valves"
3
Open the water tap.
4
Open fill and drain valve and monitor the manometer.
Содержание Altherma 3 R ECH2O
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P663482 1A 2021 11 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...