Piping installation
Installer reference guide
100
ERLA11~W1 + EBSH/X(B)11+16P30+50DF
Daikin Altherma 3 R ECH₂O
4P663482-1A – 2021.11
NOTICE
Make sure to open the stop valves after installing the refrigerant piping and
performing vacuum drying. Running the system with the stop valves closed may
break the compressor.
8.2.9 To connect the refrigerant piping to the indoor unit
1
Connect the liquid stop valve from the outdoor unit to the refrigerant liquid
connection of the indoor unit.
a
b
a
Refrigerant liquid connection
b
Refrigerant gas connection
2
Connect the gas stop valve from the outdoor unit to the refrigerant gas
connection of the indoor unit.
NOTICE
It is recommended that the refrigerant piping between indoor and outdoor unit is
installed in a ducting or the refrigerant piping is wrapped with finishing tape.
8.3 Checking the refrigerant piping
8.3.1 About checking the refrigerant piping
The outdoor unit's
internal
refrigerant piping has been factory tested for leaks. You
only have to check the outdoor unit's
external
refrigerant piping.
Before checking the refrigerant piping
Make sure the refrigerant piping is connected between the outdoor unit and the
indoor unit.
Typical workflow
Checking the refrigerant piping typically consists of the following stages:
1
Checking for leaks in the refrigerant piping.
2
Performing vacuum drying to remove all moisture, air or nitrogen from the
refrigerant piping.