16
|
Technical data
Installer reference guide
273
EPRA08~W1 + ETSH/X(B)12P30+50EF
Daikin Altherma 3 H MT ECH₂O
4P663478-1 – 2021.07
16.3 Piping diagram: Indoor unit
M S
2
M S
1
R1T
R T
2
R T
7
A
B
B
a2
a1
f
g
g
l
l
l
l
S1L
c2
c1
B
C
g
B
g
3D136050
b2
d1
b1
d2
l
l
l
l
R T
5
R T
8
e
h
i
k
m
B
B1PW
B L
2
A
Indoor unit
B
Field installed
C
Optional
a1
Space heating/cooling – Water IN (screw connection, 1")
a2
Space heating/cooling – Water OUT (screw connection, 1")
b1
DHW – Cold water IN (screw connection, 1")
b2
DHW – Hot water OUT (screw connection, 1")
c1
Water IN from outdoor unit (screw connection, 1")
c2
Water OUT to outdoor unit (screw connection, 1")
d1
Water IN from bivalent heat source (screw connection, 1")
d2
Water OUT to bivalent heat source (screw connection, 1")
e
Pump
f
Backup heater
g
Shut-off valve, female-female 1"
h
Expansion vessel
i
Drain valve
k
Safety valve
l
External thread 1"
m
External thread 3/4"
B2L
Flow sensor
B1PW
Space heating water pressure sensor
M1S
Tank valve
M2S
Bypass valve
R1T
Thermistor (water IN)
R2T
Thermistor (backup heater – water OUT)
R5T, R8T
Thermistor (tank)
R7T
Thermistor (tank - water OUT)
S1L
Flow switch
Screw connection
Flare connection
Quick coupling
Brazed connection
Содержание Altherma 3 H MT ECH2O
Страница 301: ......
Страница 302: ......
Страница 303: ......
Страница 304: ...4P663478 1 2021 07 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...