6
|
Unit installation
Installer reference guide
68
EPRA14~W1 + ETBH/9W
Daikin Altherma 3 H HT W
4P587501-1A – 2020.01
6.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
NOTICE
Level.
Make sure the unit is level. Recommended:
Use 4 sets of M12 anchor bolts, nuts and washers. Provide at least 150 mm of free
space below the unit. Additionally, make sure the unit is positioned at least
100 mm above the maximum expected level of snow.
Anchor points
800
(mm)
479
Pedestal
When installing on a pedestal, make sure that the discharge grille still can be put in
its safety position. See
"6.3.7 To remove the discharge grille, and put the grille in
800
479
a
≥150
(mm)
4× M12
Содержание Altherma 3 H HT EPRA16DAW1
Страница 263: ......
Страница 264: ...4P587501 1A 2020 01 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...