8
|
Electrical installation
Installer reference guide
108
EPRA14~W1 + ETBH/9W
Daikin Altherma 3 H HT W
4P587501-1B – 2020.10
B
C
A
A
B
C
A
A
M2S
NO
NC
C
5 6
X2M
C
21 28
X2M
C
5 6
X2M
C
21 29
X2M
B
X2M
3
Fix the cable with cable ties to the cable tie mountings.
8.3.4 To connect the electricity meters
Wires: 2 (per meter)×0.75 mm²
Electricity meters: 12 V DC pulse detection (voltage supplied by PCB)
[9.A]
Energy metering
INFORMATION
In case of an electricity meter with transistor output, check the polarity. The positive
polarity MUST be connected to X5M/6 and X5M/4; the negative polarity to X5M/5
and X5M/3.
1
63]):
1
Front panel
1
2
3
2
Switch box cover
3
Switch box
2
Connect the electricity meters cable to the appropriate terminals as shown in
the illustration below.
Содержание Altherma 3 H HT EPRA16DAV3
Страница 259: ......
Страница 260: ...4P587501 1B 2020 10 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...