background image

8 Commissioning

Installation manual

25

EA23DA6V(7)+9W
Daikin Altherma 3 H F
4P556073-1A – 2021.09

8

Commissioning

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

NOTICE

Make sure both air purge valves (one on the magnetic filter
and one on the backup heater) are open.

All  automatic  air  purge  valves  MUST  remain  open  after
commissioning.

INFORMATION

Protective  functions  –  "Installer-on-site  mode"

.  The

software  is  equipped  with  protective  functions,  such  as
room antifrost. The unit automatically runs these functions
when necessary.

During  installation  or  service  this  behaviour  is  undesired.
Therefore, the protective functions can be disabled:

At  first  power-on:

  The  protective  functions  are

disabled  by  default.  After  12  hours  they  will  be
automatically enabled.

Afterwards:

  An  installer  can  manually  disable  the

protective  functions  by  setting  [9.G]: 

Disable

protections

=

Yes

.  After  his  work  is  done,  he  can

enable  the  protective  functions  by  setting  [9.G]:

Disable protections

=

No

.

8.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit MUST be closed. Power-up the
unit after it is closed.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The following 

field wiring

 has been carried out according

to this document and the applicable legislation:

▪ Between the local supply panel and the outdoor unit

▪ Between indoor unit and outdoor unit

▪ Between the local supply panel and the indoor unit

▪ Between the indoor unit and the valves (if applicable)

▪ Between  the  indoor  unit  and  the  room  thermostat  (if

applicable)

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

fuses

  or  locally  installed  protection  devices  are

installed according to this document, and have NOT been
bypassed.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

Backup  heater  circuit  breaker

  F1B  (field  supply)  is

turned ON.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

There is NO 

water leak

 inside the indoor unit.

The 

shut-off valves

 are properly installed and fully open.

The 

automatic air purge

 valves are open.

The 

pressure  relief  valve

  purges  water  when  opened.

Clean water MUST come out.

The 

domestic hot water tank

 is filled completely.

8.2

Checklist during commissioning

The 

minimum  flow  rate

  during  backup  heater/defrost

operation  is  guaranteed  in  all  conditions.  See  "To  check
the  water  volume  and  flow  rate"  in 

"5.1  Preparing  water

piping"

 [

4

 8].

To perform an 

air purge

.

To perform a 

test run

.

To perform an 

actuator test run

.

Underfloor screed dryout function

The  underfloor  screed  dryout  function  is  started  (if
necessary).

8.2.1

To check the minimum flow rate

Mandatory procedure for the additional zone

1

Check the hydraulic configuration to find out which
space heating loops can be closed by mechanical,
electronic, or other valves.

2

Close all space heating loops that can be closed.

3

Start the pump test run (see 

"8.2.4 To perform an

actuator test run"

 [

4

 26]).

4

Read out the flow rate

(a)

 and modify the bypass valve

setting to reach the minimum required flow rate + 2 l/
min.

(a)

During pump test run, the unit can operate below the minimum
required flow rate.

Recommended procedure for the main zone

INFORMATION

The pump of the additional zone ensures that the minimum
flow rate for correct operation of the unit is guaranteed.

1

Check with the hydraulic configuration which space
heating loops can be closed by mechanical,
electronic, or other valves.

2

Close all space heating loops that can be closed
(see previous step).

3

Create a thermo request on the main zone only.

4

Wait 1 minute until the unit is stabilized.

5

If the additional pump is still assisting (the green
LED on the right hand sided pump is ON) increase
the flow until the additional pump is not assisting
anymore (LED is OFF).

6

Go to [8.4.A]: 

Information

 > 

Sensors

 > 

Flow

rate

.

Содержание Altherma 3 H F

Страница 1: ...Installation manual Daikin Altherma 3 H F English Installation manual Daikin Altherma 3 H F EAVZ16S18DA6V 7 EAVZ16S23DA6V 7 EAVZ16S18DA9W EAVZ16S23DA9W...

Страница 2: ...souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m u skladu sa slijede im standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s na i...

Страница 3: ...ge 17 7 2 2 Configuration wizard Time and date 17 7 2 3 Configuration wizard System 17 7 2 4 Configuration wizard Backup heater 18 7 2 5 Configuration wizard Main zone 19 7 2 6 Configuration wizard Ad...

Страница 4: ...iping installation 48 WARNING Field piping method MUST be in accordance with the instructions from this manual See 5 Piping installation 48 WARNING Ethylene glycol is toxic WARNING Due to the presence...

Страница 5: ...heater 4 1 1 Installation site requirements of the indoor unit The indoor unit is designed for indoor installation only and for the following ambient temperatures Space heating operation 5 30 C Space...

Страница 6: ...ng cases 4 2 2 To lower the switch box on the indoor unit 46 4 3 2 To connect the drain hose to the drain 47 When you need access to the high voltage switch box 2 T25 5 If you need access to the high...

Страница 7: ...hose to the drain See 4 3 2 To connect the drain hose to the drain 47 3 Slide the indoor unit into position 4 Adjust the height of the leveling feet to compensate for floor irregularities The maximum...

Страница 8: ...ntrolled valves it is important that the minimum flow rate is guaranteed even if all valves are closed In case the minimum flow rate cannot be reached a flow error 7H will be generated no heating or o...

Страница 9: ...en All automatic air purge valves MUST remain open after commissioning 5 2 4 To protect the water circuit against freezing About freeze protection Frost can damage the system To prevent the hydraulic...

Страница 10: ...e maximum allowed water volume Adding glycol to the water circuit reduces the maximum allowed water volume of the system For more information see the installer reference guide topic To check the water...

Страница 11: ...mA b Field supplied components 11 Shut off valve 2 100 mA b 12 Electricity meter 2 per meter b 13 Domestic hot water pump 2 b 14 Alarm output 2 b 15 Changeover to external heat source control 2 b Item...

Страница 12: ...ables 6 3 3 To connect the main power supply 1 Connect the main power supply In case of normal kWh rate power supply X1M X2M X5M A5P X11YB X1A 1 2 3 1 2 3 a X11Y X11YA 1 2 3 a Interconnection cable ma...

Страница 13: ...l Technical Standard setting the limits for voltage changes voltage fluctuations and flicker in public low voltage supply systems for equipment with rated current 75 A provided that the system impedan...

Страница 14: ...to the appropriate terminals as shown in the illustration below X1M X2M X5M 1 M M2P 1 2 2 Fix the cable with cable ties to the cable tie mountings 6 3 8 To connect the alarm output 1 Connect the alar...

Страница 15: ...is too high the contact will open and the user interface will show a 8H 02 error ONLY the main pump will stop Additional zone 3 Connect the safety thermostat normally closed cable to the appropriate...

Страница 16: ...access the installer settings using two different methods However NOT all settings are accessible via both methods If so the corresponding table columns in this chapter are set to N A not applicable...

Страница 17: ...r interface For units with a built in backup heater the type of heater can be viewed but not changed Code Description 9 3 1 E 03 3 6V 4 9W Domestic hot water The following setting determines if the sy...

Страница 18: ...European electricity grids If the backup heater is available the voltage configuration and capacity must be set on the user interface The capacities for the different steps of the backup heater must...

Страница 19: ...55 C Variable 1 Fancoil unit Maximum 55 C Variable 2 Radiator Maximum 65 C Fixed 8 C NOTICE Average emitter temperature Leaving water temperature Delta T 2 This means that for a same leaving water te...

Страница 20: ...the scheduled heat up cycles reheat operation is allowed 2 Schedule only The domestic hot water tank can ONLY be heated according to a schedule See the operation manual for more details Comfort setpoi...

Страница 21: ...curves 422 7 3 2 2 points curve Define the weather dependent curve with these two setpoints Setpoint X1 Y2 Setpoint X2 Y1 Example Y1 Y2 X1 X2 a Item Description a Selected weather dependent zone Main...

Страница 22: ...g Go to setpoint mode Set the setpoint mode to 3 4 Additional zone Setpoint mode WD heating fixed cooling OR Weather dependent Additional zone Cooling 3 4 Additional zone Setpoint mode Weather depende...

Страница 23: ...at indoor unit b External room thermostat at main zone c External room thermostat at additional zone NOTICE If an external room thermostat is used the external room thermostat will control the room f...

Страница 24: ...2 Capacity step 1 Equilibrium Equilibrium temperature Operation 9 6 Balancing Space heating priority Priority temperature Offset BSH setpoint Minimum running timer Anti recycle timer Maximum running t...

Страница 25: ...oltage on the identification label of the unit There are NO loose connections or damaged electrical components in the switch box There are NO damaged components or squeezed pipes on the inside of the...

Страница 26: ...correct operation of the unit can be checked by monitoring its leaving water temperature heating cooling mode and tank temperature domestic hot water mode To monitor the temperatures 1 In the menu go...

Страница 27: ...result in cracking of the screed NOTICE For the underfloor heating screed dryout to be able to start make sure the following settings are met 4 00 1 C 02 0 D 01 0 4 08 0 4 01 1 9 Hand over to the user...

Страница 28: ...rew connection 1 p Water filter main mixed zone b1 Space heating main mixed zone Water IN screw connection 1 q Loose nut 1 b2 Space heating main mixed zone Water OUT screw connection 1 B1L Flow sensor...

Страница 29: ...n OFF thermostat wireless On OFF thermostat wireless Ext thermistor External thermistor Heat pump convector Heat pump convector Position in switch box English Translation Position in switch box Positi...

Страница 30: ...ad Maximum load Normally closed Normally closed Normally open Normally open Safety thermostat Safety thermostat English Translation Safety thermostat contact 16 V DC detection voltage supplied by PCB...

Страница 31: ...uded signal A13P P1 P2 LAN adapter A14P P1 P2 user interface communication 2 core communication 2 core 4 core 5 core for C H operation 4 core for H only operation 3 core for C H operation 2 core for H...

Страница 32: ...4P556073 1A 2021 09 Copyright 2018 Daikin 4P556073 1 A 0000000 Verantwortung f r Energie und Umwelt...

Отзывы: