5 Electrical installation
Installation manual
22
EGSAH/X06+10UDA9W
Daikin Altherma 3 GEO
4P598591-1A – 2019.12
5.10
To connect the changeover to
external heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
Open the following (see
"3.2.1 To open the indoor unit"
7]):
1
Top panel
3
1
2
4
2
User interface panel
3
Front panel
4
Main switch box cover
2
Connect the changeover to external heat source cable to the
appropriate terminals as shown in the illustration below.
1×
2×
X2X1
L
N
X2 X1
a
a
Installation of EKRP1HBAA is required.
3
Fix the cable with cable ties to the cable tie mountings.
5.11
To connect the power
consumption digital inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection
(voltage supplied by PCB)
[9.9]
Power consumption control
.
1
Open the following (see
"3.2.1 To open the indoor unit"
7]):
1
Top panel
3
1
2
4
2
User interface panel
3
Front panel
4
Main switch box cover
2
Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
1
2
3
4
5
S6S
S7S
S8S
S9S
1×
2×
1
2
3
4
5
a
a
Installation of EKRP1AHTA is required.
3