![Daihen OTC Welbee WB-M350 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/daihen/otc-welbee-wb-m350/otc-welbee-wb-m350_owners-manual_3206169036.webp)
C
ONNECTING
THE
W
ELDING
P
OWER
S
OURCE
C
ONNECTION
C
HAPTER
4
4-2
4.2 Connecting the Welding Power Source
This section explains the procedure for connecting the welding power source. Follow the steps below for
connection of the welding power source.
• Do not turn on the input power of the welding power source until confirming the
completion of connection work. Otherwise, electric shock may occur.
Connection of cable at output side
(
-
Connection of cable at output side)
↓
Connection of wire feeder
(
-
↓
Connection of welding torch
(
-
↓
Connection of shielding gas
(
-
↓
Connection of input power connectors
(
-
Grounding and Connection of Input Power Supply)
↓
Confirmation of connection
(
-
Содержание OTC Welbee WB-M350
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS vi MEMO...
Страница 28: ...PART NAMES PRODUCT SPECIFICATION AND CONFIGURATION CHAPTER 2 2 12...
Страница 52: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 18...
Страница 134: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6...