7-15
Chapter 7
Administrator F
unctions
I
NITIALIZING
W
ELDING
C
ONDITIONS
AND
I
NTERNAL
F
UNCTIONS
A
DMINISTRATOR
F
UNCTIONS
C
HAPTER
7
4.
Turn the parameter adjusting knob counterclockwise to display "USb" on the left digital meter.
5.
Select the data to import.
6.
Press the SAVE key.
7.
Press the ENTER key.
7.4 Initializing Welding Conditions and Internal Functions
This section explains how to initialize the welding conditions and internal functions.
If initialized, the welding conditions in memory and internal function values will return to the default
(initial) setting.
●
Turn the parameter adjusting knob further
counterclockwise to display the data to import on
the right digital meter.
⇒
The display changes in order of "ALL" -> "1" -> "2".
⇒
"ALL" means that all the data ("1" to "2") available for
importing are selected.
⇒
Details of the numbers displayed (
⇒
The LED of ENTER key flashes.
⇒
Importing the backup data starts. During backup,
the display of right digital meter changes.
⇒
When importing is completed, "End" will be
displayed on the right digital meter.
A
V
r
㧑
WARNING
m/min.
sec.
JOB No.
Hz
SAVE
ENTER
㧔
3 sec
㧕
A
V
r
㧑
WARNING
m/min.
sec.
JOB No.
ENTER
㧔
3 sec.
㧕
Hz
Содержание OTC Welbee P500L
Страница 2: ......
Страница 8: ...TABLE OF CONTENTS vi MEMO...
Страница 142: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6...
Страница 158: ...MATERIALS FOR SETTING WELDING CONDITIONS REFERENCE MATERIALS CHAPTER 10 10 16...