4.2.4.1
Caution on connection of voltage detection cable
Voltage detection cable needs to be wired so that arc voltage can be fed back with accuracy. Be sure to
check the following for reducing the influence of inductance noise.
•
Wire the voltage detection cable for the base metal away from the cable of base metal. For easier handling,
cut the voltage detection cable for base metal side to a suitable length.
•
Wire the voltage detection cable of the base metal side close to the one at the torch side (detection wire) to
narrow the area surrounded by the two voltage detection cables.
Example of adequate connection
Example of inadequate connection
Area
Содержание OTC Welbee Inverter W400
Страница 2: ......
Страница 8: ...vi MEMO...
Страница 56: ...WIRING OF VOLTAGE DETECTION CABLE AT BASE METAL SIDE CONNECTION CHAPTER 4 4 22...
Страница 116: ...OPERATION OF ANALOG REMOTE CONTROL OPTIONAL WELDING CONDITION CHAPTER 6 6 50...
Страница 134: ...CHECKING SOFTWARE VERSION ADMINISTRATOR FUNCTIONS CHAPTER 7 7 18...
Страница 146: ...TROUBLESHOOTING TROUBLESHOOTING CHAPTER 9 9 6...
Страница 150: ...REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10 10 4 10 2 1 Schematic diagram...
Страница 151: ...10 5 Chapter 10 Reference Materials REFERENCE DRAWING REFERENCE MATERIALS CHAPTER 10...
Страница 158: ...MATERIALS FOR SETTING WELDING CONDITIONS REFERENCE MATERIALS CHAPTER 10 10 12...