Device Operation 6
3
Device Operation
3.1
Device Installation
This chapter explains device installation by taking NAVIGATOR X820 for example. Please refer to actual
product.
Step 1: Insert data cable interface at the bottom of aircraft into the interface at the top of shock
absorber board, as shown in
错误
!
未找到引用源。
.
Figure 3-1
Step 2: Align 4 installation screws with bottom holes of the aircraft, and tighten them.
Fix PTZ camera onto the aircraft, as shown in
错误
!
未找到引用源。
.
Figure 3-2
Step 3: Turn on power supply of the aircraft, and wait for IMU (Inertial Measurement Unit) calibration.