Operation Manual
63
Figure 6-53 Schedule
Step 2
Press and drag the left mouse button on the timeline to set arming periods. Alarms will be
triggered in the period in green on the timeline.
●
Click
Copy
next to a day, and select the days that you want to copy to in the prompt
page, you can copy the configuration to the selected days. Select the
Select All
check
box to select all days to copy the configuration.
●
You can set 6 periods per day.
Step 3
Click
Apply
.
Step 4
(Optional) Click
Time Plan Table
to add a new time plan table.
You can:
●
Double-click the table name to edit it.
●
Click to delete the table as needed.
6.5.1.2.2 Record Linkage
The system can link record channel when an alarm event occurs. After alarm, the system stops
recording after an extended period according to the
Post-Record
setting.
Prerequisites
●
After the corresponding alarm type (
Normal
,
Motion
, or
Alarm
) is enabled, the record channel
links recording. For details, see "10.3 Setting Record Plan".
●
Enable auto record mode, the record linkage will take effect. For details, see "10.2 Setting Record
Setting Record Linkage
On the
Alarm
page, click
to enable record linkage, select the channel as needed, and set
Post-Record
to set alarm linkage and record delay.
After
Post-Record
is configured, alarm recording continues for an extended period after the alarm
Содержание IPC-HDW5842T-ZE
Страница 1: ...Network Camera Web 3 0 Operation Manual ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD V2 1 5...
Страница 118: ...Operation Manual 104 Figure 4 98 Username Step 2 Click Add User Figure 4 99 Add user operation permission...
Страница 189: ...Operation Manual 175 Figure 5 64 People counting...
Страница 231: ...Operation Manual 217 Select Setting Information Online User Figure 6 12 Online user...
Страница 235: ...Operation Manual...
Страница 236: ...Network Camera Web 5 0 Operation Manual ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD V1 0 5...
Страница 325: ...Operation Manual 77 Figure 6 70 User Step 2 Click Add Figure 6 71 Add user system...
Страница 337: ...Operation Manual 89 Figure 6 86 Remote log...
Страница 407: ...Operation Manual 159 Step 3 Click Apply...
Страница 440: ...Operation Manual 192 Figure 12 5 Area people counting number of people Figure 12 6 Area people counting stay time...
Страница 454: ...Operation Manual...
Страница 455: ...Eyeball Network Camera Quick Start Guide V1 0 2 ZHEJIANG DAHUA VISION TECHNOLOGY CO LTD...
Страница 470: ...Quick Start Guide 10 Install waterproof connector Figure 3 8 3 3 6 Adjusting Lens Angle Adjust lens angle Figure 3 9...
Страница 471: ...Quick Start Guide...
Страница 472: ......
Страница 473: ......