D1146/D1146TI/DE08TIS
MAINTENANCE MANUAL
117
Printed in Jan. 2001 PS-MMA0415-E1A
4) Reassembly
Reassembly operation is performed in reverse order of disassembly. All the gaskets
must be replaced with new ones at reassembly.
5) Testing
(1) Suction capacity test
Connect one end of a hose to the inlet
side of the feed pump and immerse the
other end of it into the fuel tank as
illustrated.
Hold the feed pump in position about 1 m
above the level of fuel in the fuel tank.
Operate the tappet at the rate of 100 rpm
and check to see if fuel is drawn in and
delivered for 40 seconds or so.
(2) Delivery test
Make a test with the feed pump mounted
on a pump tester as illustrated. Operate
the pump at the rate of 1,000 rpm and
check to see if the pump delivery is
more than 405 cc/15 seconds.
(3) Sealing test
Plug up the delivery port on the feed
pump and apply compressed air of 2
kg/cm
2
into the inlet side.
Submerge the feed pump in a container
of diesel fuel and check for air leak.
Содержание D1146
Страница 1: ...PS MMA0415 E1A MAINTENANCE MANUAL Diesel Engine D1146 D1146TI DE08TIS 65 99897 8056 Feb 2001...
Страница 28: ...D1146 D1146TI DE08TIS MAINTENANCE MANUAL 24 Printed in Jan 2001 PS MMA0415 E1A...
Страница 29: ...D1146 D1146TI DE08TIS MAINTENANCE MANUAL 25 Printed in Jan 2001 PS MMA0415 E1A...
Страница 32: ...D1146 D1146TI DE08TIS MAINTENANCE MANUAL 28 Printed in Jan 2001 PS MMA0415 E1A...
Страница 117: ...D1146 D1146TI DE08TIS MAINTENANCE MANUAL 112 Printed in Jan 2001 PS MMA0415 E1A 7 Governor adjustment DE08TIS 225PS...
Страница 119: ...D1146 D1146TI DE08TIS MAINTENANCE MANUAL 114 Printed in Jan 2001 PS MMA0415 E1A 7 Governor adjustment DE08TIS 240PS...
Страница 145: ...z WORLDWIDE NETWORK...
Страница 146: ......
Страница 147: ......