D-Link Systems, Inc.
7
DWS-1008 Install Guide
Getting Started
Equipment Rack Installation
1. Remove the four bracket screws from each side of the switch.
2. Align a bracket over the screw holes:
• For a front-mount equipment rack, align tthe bracket so that the
bracket fl ange is fl ush with the switch’s front panel and extends
away from the switch.
• For a center-mount equipment rack, align the bracket so that the
bracket fl ange is located near the center screw holes.
3. Reinsert the screws to secure the brackets to the switch.
4. Repeat for the other bracket.
5. Lift the switch into position in the equipment rack.
6. Insert the bottom rack-mount screws into the bracket fl anges to secure the
switch to the equipment rack, then insert the top screws.
Warning:
To prevent the switch from slipping, do not release the switch until
all the rack-mount screws are tight.
Tabletop Installation
1. On a clean work surface with no debris, carefully turn the switch upside
down.
2. Wipe the four placement locations for the rubber feet to clear away any oil
or dust. The location areas are marked by X’s and attach the four rubber
adhesive feet over the X’s.
3. Turn the switch right-side up, and place the switch in position on the table.
Powering On a DWS-1008 Switch
Warning:
The switch relies on the building’s installation for overcurrent
protection. Ensure that a fuse or circuit breaker no larger than 120 VAC, 15 A
U.S. (240 VAC, 10 A international) is used on the phase conductors.
1. Make sure any insertable power supply is fully seated in the switch. Attach
a power cord to an AC power source.
2. Plug the power cord into the power supply. The switch will begin booting
as soon as you plug in the power cord(s).
Getting Started (continued)
Содержание DWS-1008
Страница 1: ......
Страница 15: ...D Link Systems Inc 15 DWS 1008 Install Guide Notes Notes ...