D-Link DIS-700G-28SW Скачать руководство пользователя страница 1

DIS-700G-28SW Industrial Layer 2+ Gigabit Managed Switch with SFP slots 

Quick Installation Guide 

 

 

DIS-700G-28SW   

Industrial Layer 2+ Gigabit Managed 
Switch with SFP slots 

Quick Installation Guide

 

 

This document outlines the quick installation of the DIS-700G-28SW series. 

 

Package Checklist 

Please verify that the box contains the following items: 

Item 

Quantity 

Rack-mounted Ethernet switch 

Rack-mount bracket 

Screws (for bracket) 

ALM Terminal Block (2-pin) 

Quick Installation Guide 

RJ45 Ethernet Port Dust Cover 

14 

SFP Ethernet Port Dust Cover 

 
 

Safety Instructions 

When a connector is removed during installation, testing, or servicing, or when an energized fiber is 
broken, a risk of ocular exposure to optical energy that may be potentially hazardous occurs, 
depending on the laser output power. 

The primary hazards of exposure to laser radiation from an optical-fiber communication system are: 

  Damage to the eye by accidental exposure to a beam emitted by a laser source. 

  Damage to the eye from viewing a connector attached to a broken fiber or an energized fiber. 

 

 
 

Содержание DIS-700G-28SW

Страница 1: ...ALM Terminal Block 2 pin 1 Quick Installation Guide 1 RJ45 Ethernet Port Dust Cover 14 SFP Ethernet Port Dust Cover 2 Safety Instructions When a connector is removed during installation testing or servicing or when an energized fiber is broken a risk of ocular exposure to optical energy that may be potentially hazardous occurs depending on the laser output power The primary hazards of exposure to ...

Страница 2: ...ont View DIS 700G 28SW Rear View DIS 700G 28SW Item Description 1 System Status Indicators LED 2 Port Status Indicators LED 3 Gigabit Copper RJ45 Ports 4 100 1000BaseSFP Slot Port 25 26 1000BaseSFP Slot Port 27 to 28 5 Terminal Block for Alarm Relay output 6 Grounding Screw 7 DC terminal block dual input 8 Console Port 9 Reset Button ...

Страница 3: ...DIS 700G 28SW Industrial Layer 2 Gigabit Managed Switch with SFP slots Quick Installation Guide 3 Dimensions unit mm ...

Страница 4: ...e 1 Obtain the tools required for the mounting hardware 2 Attach the mounting brackets to the switch in one of two supported positions by using the screws in the accessory kit 3 From the front of the relay rack position the switch in preferred location 4 Secure the switch in place with the provided screws on both left and right side of mounting bracket Mounting Bracket Position 1 for Standard Moun...

Страница 5: ... output contacts are located in a 2P terminal block The alarm relay contact is Normal Open and it will be closed when detected any power failures Power Connecting AC Power Connection If you use AC power connect the AC power cord to the AC supply socket on the rear panel and plug the cord into the external power source The voltage must be 100 to 240 V 10 tolerance Warning Ensure that all power sour...

Страница 6: ...face Connecting Fiber SFP For a 1000 Mbps fiber port available please use the mini GBIC SFP These accept plug in fiber transceivers that typically have an LC style connector For a 100 Mbps fiber port port 25 26 only available please prepare the LC connectors or SC connectors with the use of an optional SC to LC adapter They are available with multimode single mode long haul or special application ...

Страница 7: ...ority None flow control To connect the host PC to the console port a RJ45 male connector to RS232 DB9 female connector cable is required The RJ45 connector of the cable is connected to the CID port of DIS 700G 28SW the DB9 connector of the cable is connected to the PC COM port The pin assignment of the console cable is shown below Connect Login to DIS 700G 28SW 1 Connecting to DIS 700G 28SW Ethern...

Страница 8: ...lt account and password Username admin Password admin 4 Change the IP address with commands listed below CLI Command SYSTEM RESET The Reset button is provided to reboot the system without the need to remove power Under normal circumstances you will not have to use it However or rare occasions the DIS 700G 28SW may not respond then you may need to push the Reset button enable configure interface vl...

Страница 9: ...pply power Alarm On Red Alarm event occurs Off No alarm RR Ring Role On Green One of 3 Ring group is enabled and is Master role Off Ring is slave role RS Ring Status On Green Ring fail happen and detected Off No ring fail detected 2 Port Status Indicators Copper port Link Act Port 1 to 24 On Green Ethernet link up but no traffic is detected Flashing Green Ethernet link up and there is traffic dete...

Страница 10: ...esponsible for compliance could void the user s authority to operate the equipment Caution This device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 This device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation Innovation Science and Economic Developmen...

Отзывы: