D+H BlueKit L-AIO Скачать руководство пользователя страница 1

L-AIO

99.828.97 1.0/02/24

Bluekit Downloads

Original instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . Page . . . . . . . 2
Product overview and mounting . . . . . . . . . . . . . . . . . Page . . . . 3–20
Connection and commissioning . . . . . . . . . . . . . . . . . . Page . . . 20–28
Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page . . . 29–36
Troubleshooting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page . . . 36–43

Содержание BlueKit L-AIO

Страница 1: ...AIO 99 828 97 1 0 02 24 Bluekit Downloads Original instructions Page 2 Product overview and mounting Page 3 20 Connection and commissioning Page 20 28 Maintenance Page 29 36 Troubleshooting Page 36 4...

Страница 2: ...nections IN OUT 22 25 Setting the coding switch on the central processing unit 26 27 Commissioning central processing unit 28 Maintenance and cleaning 29 Set maintenance mode function test ventilation...

Страница 3: ...parts Intended use Intelligent ventilation system for lift shafts Only suitable for installation indoors Functional Description The BlueKit L AIO system is used in lift shafts for the detection of a f...

Страница 4: ...to the lift controller 8 Lift Status Repeater LSR 9 Aspiration smoke detector ASD 10 SD L F1 Infrared fire detector with reflector at the bottom of the shaft Examples of application Notice information...

Страница 5: ...e exception of the mains plug which is designed as 230 V AC Emergency power batteries are required in the following cases DC drives 24V DC and systems with skylights Status display via LEDs 230 V AC C...

Страница 6: ...overview 1 2 spring return motor 24V DC drive 1 2 JK 180 ALAS 1 2 JK 190 1 2 2 Louvre window 2 Slideflap 2 Thermoflap 1 NK SL 3 2 24V DC drive RT 45 RJ LT RT 45 RJ LSR LST CO V3 2 SD L F1 PD RJ AIO H...

Страница 7: ...PD RJ AIO P G Optical smoke detector PD RJ AIO End Optical smoke detector with integrated terminal resistor SD L F1 Infrared fire detector up to 100 m shaft height ASD Aspiration smoke detector 5 Cen...

Страница 8: ...on frame for integrated installation JK 190 NK SL Blind with spring return motor for mounted installation Motor connection cable lay on the shaft side Sealing tape onto the edge of the glue the edge o...

Страница 9: ...is too high or difficult to reach the blind with the motor is placed on the opening min 30 mm Installation blind JK 180 JK 190 NK SL Standard installation JK 190 NK SL Flap is mounted from the inside...

Страница 10: ...RJ45 cable extensions Installation in the lift shaft If possible arrange the point detectors vertically in a line the maximum distance between 2 point detectors is 12 m The corresponding RJ cable len...

Страница 11: ...s on the distance to the infrared detector The reflector may be installed a maximum of 2 metres above the shaft floor Arrange the detector and reflector vertically in a line Connect the detector to th...

Страница 12: ...2 Fit the fine dust filter Ensure that the air intake direction is correct fit the finest filter towards the central unit 3 Take two angles and two 25 cm pipes from the accessory bag set glue the ends...

Страница 13: ...age of the device itself must also not be changed after initialisation has been completed otherwise the initialisation must be carried out again 5 The green LED flashes during calibration S2 Flow Init...

Страница 14: ...e mode automatic opening of the NSHEV Integrated LED indicators The LST CO2 V3 is mounted on the cabin roof e g on the rear of the door operator LED displays Operation Triggering Fault Radio fuse T0 2...

Страница 15: ...er the ventilation interval S2 5 S2 6 has drained ventilation always takes place during a ventilation period S2 3 S2 4 ON OFF Combined ventilation Without lift movement ventilation every 10 hours for...

Страница 16: ...long beep This cancels all LST CO V3s 2 Teach in of the LST CO V3 2 1 Connect the LST CO V3 to 230 V AC 2 2 After 5 seconds press the tune in button on the central unit until you hear a short signal t...

Страница 17: ...t Connect the RJ45 cable of the LSR to the M2 socket on the central unit If the socket is occupied use a RJ45 splitter article No 31 611 12 During operation of the emergency call button in the cabin a...

Страница 18: ...RT 45 RJ can be used to initiate manual ventilation and reset an alarm Up to 8 smoke evacuation buttons can be connected in series Smoke monitoring of the main evacuation level is carried out with a s...

Страница 19: ...ds 1 strand A 0 129 mm 7 strands A 0 903 mm Cable lengths Drive group connection Group current 0 2 A Cable length 110 m Group current 0 5 A Cable length 45 0 m Group current 1 0 A Cable length 22 m Se...

Страница 20: ...it continues to operate from the battery for 445 seconds groups continue to run up 5 Any alarm follow up blockade function is completed 6 Central unit is shutdown Time balance without active blockade...

Страница 21: ...ermostat humidity sensor key switch etc M1 Connection 24 V drives see note Central processing unitAssignment of RJ45 connections Notice information A spring return motor or a DC motor can be connected...

Страница 22: ...otection concept and the safety requirements of the lift directive According to EN 81 20 2014 it is prohibited to ventilate rooms adjacent to the lift shaft via the lift shaft or the machine room Term...

Страница 23: ...n ON ON Connection General status messages COM 1 Edition of various status messages via isolated contacts in the BK AIO Output fault message Can be set via DIP switches S3 1 and S3 2 Isolated contact...

Страница 24: ...t controller in the event of a maintenance or fault signal Signal from the lift controller via isolated contacts COM 2 Switch COM 1 PB Display Smoke MR Smoke SHAFT M2 M1 S3 DIP switches S3 Signalling...

Страница 25: ...Flap etc For forwarding smoke detection components e g SD L F1 Point detector in the lift shaft ASD Connection Smoke SHAFT For forwarding an operation panel RT45 RJ LT RT45 RJ Connection PB Display Fo...

Страница 26: ...group OFF ON OPEN signal Shaft group or machine room group ON ON Setting the coding switch on the central processing unit Coding switch S1 1st from left acts on M1 Status DIP Shaft group alarm delay 6...

Страница 27: ...FF ON general malfunction ON ON Coding switch S3 3rd from left Signalling relay 3 COM 2 DIP 5 DIP 6 DIP 7 General malfunction contact 1 5 normally closed contact contact 3 5 normally open contact OFF...

Страница 28: ...is pulled out incorrectly the plug and socket may be damaged Before pulling out the plug open the plug latch with a flat blade screwdriver while the housing is normally closed LED 1 teach mode LST CO...

Страница 29: ...ce or repair work is to be carried out on the ventilation element disconnect the central unit from the power supply Carry out the following testing Visual inspection for damage tightness and dirt Chec...

Страница 30: ...nance level 2 is active The ventilation element remains closed e g blower door test LED A flashes red 2x per second Maintenance level 2 The ventilation element closes 3 Check that the louvres of the v...

Страница 31: ...E N f l a p s i g n a l s h a f t S h a f t g r o u p f a u l t Status displays maintenance level 1 COM 2 Switch COM 1 PB Display Smoke MR Smoke Shaft M2 M1 V e n t i l a t i o n d e p e n d e n c y...

Страница 32: ...SD L F1 Checking a fire alarm 1 Cover the reflector so slowly that it takes more than 5 seconds to cover it 2 The detector triggers a fire alarm after 10 seconds Notice information The alarm filter o...

Страница 33: ...the inside and close the filter housing again Switch on the supply Maintenance and cleaning aspiration smoke detector Function test of additional components RT 45 RJ LT RT 45 RJ signalling button 1 Op...

Страница 34: ...tus If connected to an on site fire alarm control unit arrange for the shutdown of the corresponding line of the fire alarm system by the person responsible for the building Arrange for forwarding to...

Страница 35: ...o LED Displays Function test aspiration smoke detector ASD Fault 1 Cover the intake hole with your finger LED flashes 2 After 20 seconds the yellow LED lights up continuously and the ventilation eleme...

Страница 36: ...mergency power supply lights up Emergency power supply fault Check the mains fuse in the fuse distributor Check battery charge replace battery if necessary Notice information LED 3 Central unit and LE...

Страница 37: ...component or cable connection has an insulation fault Electrical connector with protective earth or earth potential LED yellow for LST CO V3 Temperature message 35 C 35 C 2 Ventilation interval activ...

Страница 38: ...equipped quickly cover the prism If the SD L F1 shows a FIRE signal instead of a FAULT signal remove the cover on the prism again Then press and hold the left and right direction buttons on the SD L F...

Страница 39: ...SR malfunction see next page LED lights up communication LST works Replace CPU Battery or 230 V AC Check connection First time Teach in failure N Y N LED lights up power supply LED o for the rst time...

Страница 40: ...1 LED on the central unit lights yellow or red Pull out the motor connector plug VE opens N Y Reconnect the motor VE closes N Y Change CPU Check VE change motor if necessary Connect the motor Press th...

Страница 41: ...k voltage via test plug with measuring device Check Rj45 cabling Check motor fuse System is working Exit service level 1 Normal operation 24 V DC on the motor 24 V DC on the motor N Y N After a ventil...

Страница 42: ...ED ashing Ventilation element CLOSED Fault alarm removed Smoke vent button available CPU Yellow LED lights up CPU LED Power lights up CPU Red LED lights up Change CPU Wait for end of the ventilationcy...

Страница 43: ...via test plug with measuring device Check ventilation element change motor if necessary Check RJ45 cabling Connect 230 V AC mains supply After a ventilation command the 24 V DC supply voltage is appli...

Страница 44: ...s D H MechatronicAG Georg Sasse Str 28 32 Germany 22949Ammersbek 49 239 Tel 40 605 65 49 Fax 40 605 65 254 E Mail info dh partner com www dh partner com 2022 D H Mechatronic AG Ammersbek Rights to tec...

Отзывы: