4
Groups of three or four units are easy to
transport by truck as we will see in this manual.
We will also see the preparation with
EVENT-208A
y
EVENT-210A
. But, such an extensive explanation
isn’t required for
EVENT-218A
, as this model can be
used only in stacked systems lacking a rigging
system (stacking up to 3 units on a
PL-EV218S
).
Once the packaging is removed, you can see
three security pins on both enclosure sides (see
figure), near the handles.
Now, you remove two security pins (see the
red arrows in the Fig.1), on each side.
Lift the enclosure by the handles and sit it
gently over the platform (Fig. 2), aligning the holes
for pins as shown in Fig.3.
Now, as shown in Fig.4, we insert the
previously removed pins (the result is shown in
Fig.5).
Warning: For transport, introduce the pin
in hole 0º at “Rear Link" (both sides).
These pins allow to hold the first enclosure to
the platform and, now, we will position the second
enclosure
We will lift the hidden front and rear rods on
both sides (see the grey arrows in Fig.6).
Note the front rod will "click" when blocked,
but the back rod does not block.
Now, we move the pins left in the side and we
insert it into the hole "Fix angle" corresponding to
0º (it is mandatory for safe transport), as shown in
red at Fig.6 and Fig.7.
The result is shown in Fig.8. Now, to position a
second enclosure, we will proceed similarly to the
union between the first enclosure and the platform.
Fig.3
Fig.6
0º
0º
Fig.4
Fig.7
Fig.5
Fig.8
4 UNITS MOUNTING ON A FLATBED DOLLY
Manual de Colgado
/
event series
/
Rigging Manual
Fig.2
These security pins
on each side
must be removed
Fig.1
CLICK