CR-MM-1-0-00
PS-28 Cruiser
PS-28N Cruiser
CHAPTER 12 – INSTRUMENTS AND AVIONICS
Date of issue: 2018-09-27
Revision No.: 22
12 - 41
12.3.24
Installation of COMM antenna
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
screwdriver
-
wrench No. 7
(a) Remove the protective cover from the antenna connector.
(b) Place the antenna (1, Fig. 12-35) with the gasket (2) on the fuselage (8).
(c) Insert the screws (3) with washers (6) to the holes in the antenna body (1); install the
washers (5), screw and tighten the nuts (4).
(d) Connect the connector (7) to the antenna (1).
(e) Set the
MASTER BAT
,
AVIONICS
switches to ON and
do an operational test.
12.3.25
Removal of NAV antenna
Type of maintenance: line
Authorization to perform:
See point 2.5.3.
Tools needed:
-
Phillips PH2 screwdriver
-
wrench No. 8
(a) Set the
MASTER BAT
,
AVIONICS
switches to OFF.
(b) Unscrew the screws (7, Fig. 12-36) and remove the fin tip (6).
(c) Remove the nuts (4) and disconnect the cables (5) from antenna studs.
(d) Unscrew the screws (2) with the washers (3) and remove the antenna (1).
Содержание CRUISER AIRCRAFT PS-28 Cruiser 2021
Страница 2: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 ii INTENTIONALLY LEFT BLANK ...
Страница 4: ...CR MM 1 0 00 Revision No 25 Date of issue 2021 01 15 iv INTENTIONALLY LEFT BLANK ...
Страница 356: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 6 ...
Страница 357: ...CR MM 1 0 00 PS 28 Cruiser PS 28N Cruiser CHAPTER 17 APPENDICES Date of issue 2012 12 10 Revision No 4 17 7 ...
Страница 358: ...PS 28 Cruiser PS 28N Cruiser CR MM 1 0 00 CHAPTER 17 APPENDICES Revision No 4 Date of issue 2012 12 10 17 8 ...