
C
Y
RAQ
®
24J Series
CyberResearch
®
Displays
3.3 Flush Panel-Mounting
Prior to performing subsequent steps, ensure the panel-mounting location (including
panel thickness) is suitable for the C
Y
RAQ
®
24J, and meets environmental requirements
in General Specifications section.
3
N
OTE
: Panel thickness should not exceed: .55" (14.1mm) Suggested panel thickness
is calculated based on standard C
Y
RAQ 24J parts and dimensions, custom units may not
meet these specifications. Install Poron™ gasket prior to beginning monitor installation
process below.
3.3.1 Installation
1.
Install the Poron™ gasket on the bezel surface that mates with panel.
2.
Panel cutout is 448mm H x 623mm W for landscape installation (Figure 6).
3.
Install the display in panel cutout by pressing the bezel to the front of the panel,
passing the monitor through the cutout hole.
4.
Ensure and Poron
™
gasket is flush against panel (critical for NEMA compliance).
5.
From the back of the panel, put the Compression Mounting Plate over the
monitor as shown in Figure 6. The holes in the Compression Mounting Plate align
with the studs on the monitor bezel.
6.
Spin the nuts onto bezel studs. Tighten them gradually and evenly.
Important!
Do not exceed 30 in/lbs when tightening mounting nuts.
See Next Page for Illustration
16 ©
Copyright 2011
CyberResearch, Inc