Operating instructions Multi-cell compressor RKL 160
Start-up and operation
21
6 Start-up and operation
6.1 Safety notes
See chapter 2.6 "Occupational safety and special risks".
6.2 Start-up
Inspection prior to initial start-up
The following points must be checked prior to initial start-up:
Transport damage at the RKL 160
Conduits for free passage and leak tightness.
Screw connections for tightness.
Drive's sense of rotation by briefly switching it on and off
(observe rotation direction arrow).
Direction of installation and function of non-return valve.
Safety valve function.
Accidental contact protection function.
Start-up
Open present shut-off devices
Switch on drive (engage gently)
Adjust input speed
Check the operating data.
Inspections during operation
During operation
the operator
has to check the following data
every 10 minutes
:
Input speed (see Tab. 2)
Final overpressure (see Tab. 2).
6.3 Switching off
Switch off the RKL 160 as follows:
Switch off drive.
Close the shut-off valves (if installed)
Drain the condensate tank (if available) Tank may not be under
pressure then.
6.4 Inspections to be performed
Non-return valve inspection
The non-return valve is maintenance free, but is subject to wear
like any other moving part. We recommend a visual inspection
every 3 months. In this connection, the non-return valve must be
dismantled, cleaned, freed of deposits and checked for freedom of
motion.
Содержание RKL 160
Страница 29: ...Operating instructions Multi cell compressor RKL 160 Index 29...
Страница 30: ......
Страница 31: ......
Страница 32: ......