INSTALLATION INSTRUCTIONS
II16
(&."*/45"--"5*0/*/4536$5*0/4ø
022218C
18 Replace the top cover. Reconnect the power cord
and turn on the toggle switch on the back of the unit.
The water in the tank will begin to heat. Depending
on the incoming water temperature and the electrical
TQFDJmDBUJPOTUIFXBUFSUBOLUZQJDBMMZSFRVJSFTUP
minutes to reach the factory set operating temperature.
When the water has heated, the BREW WHEN LIT light
will turn on.
19
#FGPSFCSFXJOHGPSUIFmSTUUJNFEJTQFOTFPVODFTPG
hot water through the hot water faucet to help purge air
from the tubing inside the brewer.
20 Brew a cycle of at least 1/2 gallon, to purge any
remaining air from the tubing. See the
OPERATING
INSTRUCTIONS
. During the initial brew cycle and
XIFOFWFSUIFmMUFSJTSFQMBDFEZPVNBZIFBSUIFTPVOET
PGBJSCFJOHQVSHFEGSPNUIFmMUFSUVCJOHBOEXBUFSUBOL