background image

 

 

 

 
 
 

FOS-5126 Series 

 
 
 
 
 
 

 

20 PORTS 100/1000BASE-X SFP + 4 COMBO PORTS 

(10/100/1000BASE-T, 100/1000BASE-X SFP) WITH 2 

UPLINK Ports 10 Gbps SFP+ MANAGEMENT 

SWITCH 

 
 
 
 
 
 
 
 
 
 

 

 
 
 
 

User

’s Guide 

 

Version 0.90 

Содержание FOS-5126 Series

Страница 1: ...FOS 5126 Series 20 PORTS 100 1000BASE X SFP 4 COMBO PORTS 10 100 1000BASE T 100 1000BASE X SFP WITH 2 UPLINK Ports 10 Gbps SFP MANAGEMENT SWITCH User s Guide Version 0 90...

Страница 2: ...area is likely to cause harmful interference in which case the user will be required to correct the interference at their own expense CE Mark Warning This is a Class A product In a domestic environme...

Страница 3: ...3 Revision History Version Date Description 0 90 20151209 First release...

Страница 4: ...1 5 Network Management 9 2 INSTALLATION 10 2 1 Requirement 10 2 2 Checking the Package Contents 10 2 3 Install the Managed Switch 11 2 4 Power ON 13 2 5 Connect the Switch to network 13 3 OPERATION 14...

Страница 5: ...0Base T 100 1000Base X SFP and 2 UPLINK Ports 10 Gbps SFP in front panel This Managed Switch provides high performance store and forward switching capability plus other advanced features such as QoS V...

Страница 6: ...tching Features Store forward switching Non blocking switching fabric 88Gbps Mac address table 16K Memory buffer total 1536K bytes VLANs support up to 2K VLAN Groups Support jumbo frame on all ports u...

Страница 7: ...Pressing reset button for 5 10 seconds then release to restart the system Pressing reset button for more than 10 seconds then release to reset the Managed Switch back to factory settings and restart t...

Страница 8: ...rs max EIA TIA 568 150 ohm STP 100 meters max 1000Base T UTP Cat 5e 100 meters max UTP Cat 5 100 meters max EIA TIA 568B 150 ohm STP 100 meters max 100BASE FX Multi mode fiber module 2km Single mode f...

Страница 9: ...for the first time Telnet Management Telnet is done through the network Once there is a network connection to the Managed Switch users can use Telnet to configure control and monitor the system Using...

Страница 10: ...twork 2 1 Requirement Basic requirements for installation are as follows Environmental conditions One power outlet Proper ventilation Proper isolation to electrical noise radio etc UTP cables should n...

Страница 11: ...ot too far from the device Visually inspect the power cord and see that it is secured to the AC power connector Make sure that there is proper heat dissipation from and adequate ventilation around the...

Страница 12: ...Rack mounting brackets are provided to mount the Switch Procedure 1 Plan the rack position 2 Attach the mounting bracket on the switch s side panels one on each side and secure them with the screws pr...

Страница 13: ...d into the switch at the back of the device When power is resumed plug the power back to the switch 2 5 Connect the Switch to network Connect to Network The Managed Switch has 20 SFP with 4 combo port...

Страница 14: ...system remotely 3 1 LED Definitions Front Panel Power A B LED The Power A B has two LED indicators The upper one is for internal Power A and lower one is for internal power B LED Color Operation PWR A...

Страница 15: ...n Green The link is up and the speed is in 100Mbps Orange The link is up and the speed is in 1000Mbps Blinking Green Traffic is present Blinking Orange Traffic is present The port is in loop while slo...

Страница 16: ...eatly reduce the times required to find problem and solution Users may perform local check or remote check to find the problems Local Check Users can perform local check by observing LED indicators st...

Страница 17: ...O NOT UNDER ANY CIRCUMSTANCES open and attempt to repair it Failure to observe this warning could result in personal injury or death from electrical shock Failure to observe the above warning will imm...

Отзывы: