
Network Terminal Installation, Operation, and Maintenance Instructions
P/N 8040375G001
5-3
C
HELIX TECHNOLOGY CORPORATION
-
TI
CRYOGENICS
Figure 5-1: Memory Backup Battery (B1) and Resistor (R3) Locations
J4
Battery (B1)
J2
J3
Resistor (R3)
Place Negative (-)
Meter Probe Here.
Place Positive (+)
Meter Probe Here.
Front