EN • 15
STEP 8 PULSE
Maintaining the battery at 95–100% capacity. The charger
monitors the battery voltage and gives a pulse when neces-
sary to keep the battery fully charged.
STEP 1 DESULPHATION
Detects sulphated batteries. Pulsing current and voltage,
removes sulphate from the lead plates of the battery restor-
ing the battery capacity.
STEP 2 SOFT START
Tests if the battery can accept charge. This step prevents
charging of a defective battery.
STEP 3 BULK
Charging with maximum current until approximately 80%
battery capacity is reached.
STEP 4 ABSORPTION
Charging with declining current to maximize up to 100%
battery capacity.
STEP 5 ANALYSE
Tests if the battery can hold charge. Batteries that cannot
hold charge may need to be replaced.
STEP 6 RECOND
Choose
the Recond program to add the Recond step to the
charging process. During the Recond step voltage increases
to create controlled gassing in the battery. Gassing mixes
the battery acid and returns energy to the battery.
STEP 7 FLOAT
Maintaining the battery voltage at maximum level by pro-
viding a constant voltage charge.
EN
LIMITED WARRANTY
CTEK Power Inc, issues this limited warranty to the original
purchaser of this product. This limited warranty is not transfera-
ble. The warranty applies to manufacturing faults and material
defects for 5 years from the date of purchase. The customer
must return the product together with the receipt of purchase
to the retailer. This warranty is void if the battery charger has
been opened, handled carelessly or repaired by anyone
other than CTEK Power Inc or its authorised representatives.
CTEK Power Inc makes no warranty other than this limited
warranty and is not liable for any other costs other than those
mentioned above, i.e. no consequential damages. Moreover,
CTEK Power Inc is not obligated to any other warranty other
than this warranty.
CHARGING PROGRAMS AND OPTIONS COMBINATIONS
20018888A MUS 4.3 Test&Charge, Manual, Print file.indd 15
2013-01-15 16:28:32