Chapter 2 Installation
10
Chapter 2 Installation
2.1 Introduction
The Installation chapter will cover the physical installation of the
FRM220-CH08
, Rack Mount In-Band
Managed Series Fiber Converter Platform Chassis, the electrical connections, interface connections and cabling
requirements. A brief overview of the functional components such as main unit and management options will also
be outlined in this chapter.
Required Tools
You will need these tools to install the
FRM220-CH08
:
Number 2 Phillips screwdriver for the 3mm and the 12-24 rack installation screws.
Wrist strap or other personal grounding device to prevent ESD occurrences.
Antistatic mat or antistatic foam to set the equipment on.
2.2 Site Preparation
Install the
FRM220-CH08
within reach of an easily accessible grounded AC outlet or three wire (-48VDC,
Power return, Earth Ground) central office power. The AC outlet should be capable of furnishing 100 to 240 VAC.
Refer to 2.4 Electrical Installation. Allow at least 10cm (4 inch) clearance at the front of the
CH08
for the Fiber and
other copper cables.
2.3 Mechanical Assembly
CH08
is designed for rack mount installation and will require 1U space in a standard EIA 19" or 23" rack.
CH08
chassis is delivered completely assembled, however power modules and converter cards may or may not be
installed in the chassis upon delivery. The rack mount adapters may be placed along the front or centrally located
on the chassis.
2.3.1 Rack mounting
Figure 2-1 Standard 19" Rack-Mount Installation of
CH08
Unit requires 1RU space
Brackets are installed
for 19" mounting.
(factory installed)
Содержание FRM220-CH08
Страница 1: ...FRM220 CH08 Hardware Installation...
Страница 2: ......
Страница 6: ...Table of Contents ii...
Страница 18: ...Chapter 3 Management Quick Start 18...
Страница 19: ......
Страница 20: ......