69
67
BOILER MODEL
98-111
980888
980425
980
92
0
900365
95-040
95-081
95-134
950500
95-096
95-027
95-057
95-105
950185
950114
950190
950110
95-047
95-033
95-058
95-031
32-475W
111111
1111
32-570W
111111
1111
32-665W
11111
1
1111
32-760W
11111
1
1111
32-855W
11111
1
1111
32-950W
11112
1
1111
32-1045W
11112
1
1111
32-1140W
11112
1
1111
32-1235W
11112
1
1111
32-1330W
11112
1
1111
32-1425W
11112
1
1111
32-1520W
11112
1
1111
32-1615W
11112
1
1111
32-1710W
11112
1
1111
32-1805W
11112
1
1111
32-1900W
11112
1
1111
32-1995W
11112
1
1111
32-2090W
11113
1
1111
32-2185W
11113
1
1111
32-2280W
11113
1
1111
32-2375W
11113
1
1111
32-2470W
11113
1
1111
32-2565W
11113
1
1111
32-2660W
11113
1
1111
32-2755W
11113
1
32-2850W
11113
1
WATER BOILER CARTON
DESCRIPTION
ETL RAT
IN
G PL
ATE
INSTA
LLATION MA
NUAL
USER'S M
ANUAL
NIPPLE
GAUGE
RESBOND 907GF-6
CP, 11 oz T
UB
E
30 PS
I R
ELIE
F V
ALV
E, C
ON
BR
AC
O 10-408-05
30 PS
I R
ELIE
F V
ALV
E, C
ON
BR
AC
O 10-614-05
30 PS
I R
ELIE
F V
ALV
E, C
ON
BR
AC
O 10-615-05
30 PS
I R
ELIE
F V
ALV
E, C
ON
BR
AC
O 10-616-05
1-1
/2 X 3
/4 BL
K BUSHING
3/4
X 3 BL
K NIPPL
E
3/4 ELB
OW
3/4
X CL BL
K NIPPL
E
1-1
/2 X 1
BLK BUSHI
NG
1 X 4
BLK NI
PPLE
1 EL
BOW
1-1
/4 X CL
BLK NI
PPLE
1 X CL
BLK NI
PPLE
1-1/2 X 1-1/4 B
LK
BU
SH
ING
1-1
/4 X 4
BLK NI
PPLE
1-1/4 ELB
OW
Содержание 32 Series and
Страница 2: ...2 ...
Страница 4: ...4 Figure 1 Base Model General Configuration 2 II Specifications ...
Страница 13: ...13 11 Figure 4 Multiple Base Assembly ...
Страница 15: ...15 13 Figure 6 Assembly Of Sections Figure 5 Use Of Nipple Gauge ...
Страница 20: ...20 18 Figure 14 Exploded View Of Jacket Assembly ...
Страница 24: ...24 22 Figure 19 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room ...
Страница 34: ...34 Figure 26 Typical Near Boiler Piping When Using A Boiler Feed Pump 32 ...
Страница 35: ...35 Figure 27a Recommended Steam Boiler Piping 1 or 2 Supply Connections Gravity Return 33 ...
Страница 36: ...36 Figure 27b Recommended Steam Boiler Piping 3 Supply Connections Gravity Return 34 ...
Страница 37: ...37 35 Figure 27c Recommended Steam Boiler Piping 4 5 or 6 Supply Connections Gravity Return ...
Страница 42: ...42 40 Figure 30 Typical Water Boiler System Piping ...
Страница 49: ...49 47 Figure 35 Series 32 Standard Boiler Wiring ...
Страница 50: ...50 48 Figure 36 Series 32 CSD 1 Boiler Wiring ...
Страница 65: ...65 63 Figure 42 Exploded View Base Parts ...
Страница 67: ...67 65 Figure 43 Exploded View Gas Manifold Burners Pilot Assembly ...