background image

1

D      

E

   

S

   

I

   

G

   

N

   

E

   

D

              

T

     

O

          L    

E

   

A

  

D

Tel: (215) 535-8900 • Fax: (215) 535-9736 • www.crownboiler.com

Manufacturer of  Hydronic Heating Products

P.O.  Box 14818   3633 I.  Street

Philadelphia,  PA  19134

Series 16

 

Gas-Fired Natural Draft Water Boilers

 

INSTALLATION AND OPERATING INSTRUCTIONS

 These instructions must be affixed on or adjacent to the boiler.

WARNING

: Improper installation,

adjustment, alteration, service or
maintenance can cause property
damage, injury, or  loss of life. For
assistance or additional information,
consult a qualified installer, service
agency  or  the gas supplier. Read
these instructions carefully before
installing.

Содержание 16 Series and

Страница 1: ...raft Water Boilers INSTALLATION AND OPERATING INSTRUCTIONS These instructions must be affixed on or adjacent to the boiler WARNING Improper installation adjustment alteration service or maintenance ca...

Страница 2: ...2...

Страница 3: ...X Control System Wiring 26 A Standard 27 B CSD 1 27 XI Start Up Checkout 31 XII Service Maintenance 35 XIII Parts 37 I Product Description The Series 16 boiler is a cast iron hot water boiler designed...

Страница 4: ...4 2 II Specifications...

Страница 5: ...at the correct altitude 6 Follow the instructions in Section V to assemble the boiler IV Locating the Boiler 1 Do not install this boiler directly on a combustible floor This boiler may be installed...

Страница 6: ...stall this boiler in a location where gasoline or other flammable vapors or liquids will be stored or used Do not install this boiler in an area where large amounts of airborne dust will be present su...

Страница 7: ...Ove r A ll De p th Jack e t Ove r A ll He ig h t Flo o r T o T o p Of Jack e t Bo ile r V o lu m e Ft3 M in im u m Ro o m V o lu m e Ft3 16 325 23 3 4 32 7 16 32 1 2 14 5 231 8 16 390 27 1 2 32 7 16...

Страница 8: ...ase hold down bolts used to anchor the assembly to the skid 5 Exercise care to avoid dropping the boiler while removing it from the skid 6 Leak test the heat exchanger before installing the jacket tri...

Страница 9: ...well from the Combination Boiler Parts and Control Carton Insert the immersion well in tapping D See Figure 4 If a second limit or operating control is used it is recommended that it be installed in...

Страница 10: ...metal screws four per side as shown in Figure 6 4 On the front of the boiler insert the jacket vestibule panel between the left and right jacket side panels Align the screw holes located on the side f...

Страница 11: ...ontrol module to the ignition module base using 4 8 x 1 2 sheet metal screws 6 Connect the green ground wire from the pilot assembly to terminal number 4 Burner GND on the ignition control module 7 Co...

Страница 12: ...12 10 Figure 6 Jacket Assembly...

Страница 13: ...13 11 Figure 7 Gas Train Standard Build Figure 8 Gas Train CSD 1 Build 16 455 16 520 16 585...

Страница 14: ...wiring instructions c Temperature Pressure Gauge Install the T P gauge in tapping H Tapping H is located on the supplied 2 NPT x 10 supply nipple See Figure 9 DO NOT TIGHTEN THE GAUGE BY ITS CASE d L...

Страница 15: ...n 3 Determine total input of all fuel burning appliances in the boiler room space Add inputs of all fuel burning appliances in the boiler room space and round the result to the next highest 1000 Btu p...

Страница 16: ...area of 1 square inch per 4 000 Btu per hour input of all fuel burning appliances in the boiler room space but not less than 100 square inches The cross sectional area of the duct shall be the same a...

Страница 17: ...17 15 Figure 11 All Air From Outdoors Ventilated Crawl Space Attic Figure 12 All Air From Outdoors Via Ventilated Attic Figure 13 All Air From Outdoors Using Openings Into Boiler Room...

Страница 18: ...18 16 Figure 14 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room...

Страница 19: ...There are two conditions under which an exterior chimney may be used In some very restrictive cases Series 16 boilers may be vented into an exterior ceramic lined masonry chimney See the National Fuel...

Страница 20: ...ch assembly from top of boiler Uncoil power cord b Position mounting bracket onto lower edge of draft hood skirt Locate center tooth with 10 sheet metal screw on outside and other two teeth inside dra...

Страница 21: ...The damper wire harness is shipped loose One end of the harness is provided with a quick connect fitting and the other end of the harness is provided with a connector nut Attach the end with the conne...

Страница 22: ...ance not connected to the common venting system Turn on any exhaust fans such as range hoods and bathroom exhausts so they will operate at maximum speed Do not operate a summer exhaust fan Close firep...

Страница 23: ...ve to the end of the coupling c Circulator Required The best circulator location is usually on the supply piping just downstream of the expansion tank as shown in Figure 18 d Expansion Tank Required I...

Страница 24: ...hown in Figure 18 will minimize the amount of time that the boiler operates with return temperatures below 120 F on these systems A bypass is installed as shown to divert some supply water directly in...

Страница 25: ...25 23 Figure 18 Standard Boiler Piping...

Страница 26: ...26 Figure 19 Recommended Piping for Combination Heating Cooling Refrigeration System 24...

Страница 27: ...own 3 Be sure to use a pipe thread compound pipe dope compatible with the fuel type to be used i e NG natural gas or LP liquefied petroleum for all gas line connections 4 The use of teflon tape is not...

Страница 28: ...ted in the vestibule and insert the plug from the vent damper harness into the vent damper receptacle Cut the jumper wire on the jumper plug and discard it 6 The 24 volt thermostat operating control s...

Страница 29: ...ntrol contacts will be open 2 Upon a call for heat the operating control will make and the vent damper if used will open Simultaneously 120 volts will be applied to the circulator 3 24 volts will then...

Страница 30: ...30 28 Figure 21 Series 16 Standard Boiler Wiring...

Страница 31: ...31 29 Figure 22 Series 16 CSD 1 Boiler Wiring...

Страница 32: ...ation when flue gas spillage caused by a complete vent blockage occurs The circulator continues to operate and the vent damper if used remains open with a call for heat If the blocked vent switch is a...

Страница 33: ...nt damper if used has fully opened 7 Start the boiler using the appropriate lighting instructions for the gas valve on the boiler on page 34 NOTE SAFE LIGHTING AND OTHER PERFORMANCE CRITERIA WERE MET...

Страница 34: ...ner and main burners should stop firing 13 Check the manifold pressure and adjust if necessary To do this use the following procedure a Connect a manometer to the inlet pressure tap on the gas valve S...

Страница 35: ...emperature to increase to high limit setting The burners should shut down the circulator continues running and the vent damper if used closes Allow the boiler water temperature to drop below high limi...

Страница 36: ...to lowest setting 3 Turn off all electric power to the appliance 4 This appliance is equipped with an ignition device which automatically lights the pilot Do try to light the pilot by hand not 5 Remo...

Страница 37: ...a soft bristle brush and then vacuuming out any debris through the venturi opening 5 Inspect the pilot assembly Clean any deposits found on the electrode and grounding strap The ideal gap between the...

Страница 38: ...ch on the skirt of the draft hood as shown in Figure 16 18 Reconnect the vent system including the optional vent damper if previously installed WARNING SOOT DEPOSITS IN THE FLUE PASSAGES ARE A SIGN TH...

Страница 39: ...urner orifice 37 16 325 16 390 16 455 16 520 16 585 1 EACH 1 EACH 1 EACH 1 EACH 16 325 1 1 1 1 260206 260136 500506 260035 16 390 1 1 1 1 260207 260137 500507 260036 16 455 1 1 1 1 260208 260138 50050...

Страница 40: ...40 Figure 26 Exploded View Base Parts Manifold 38...

Страница 41: ...AS INCLUDED IN PILOT ASSEMBLY 1 1 1 1 1 17b KF16 PILOT ORIFICE LP GAS INCLUDED IN PILOT ASSEMBLY 1 1 1 1 1 17c 1 4 COMPRESSION FERRULE 3501150 1 1 1 1 1 18 10 32 X 3 16 MACHINE SCREW 146 95 301 2 2 2...

Страница 42: ...42 Figure 27 Exploded View Base Heat Exchanger Flue Collector Assembly 40...

Страница 43: ...520 260129 1 16 585 260130 1 32 5 16 18 X 1 1 2 HEX HEAD CAP SCREW 900415 6 6 6 6 6 33 3 8 FLAT WASHER 90 036 6 6 6 6 6 34 5 16 18 HEX NUT 90 910 6 6 6 6 6 35 5 16 18 X 3 4 HEX HEAD CAP SCREW 900400...

Страница 44: ...44 42 Figure 28 Exploded View Jacket...

Страница 45: ...43 VESTIBULE PANEL 44 TOP JACKET PANEL 45 JACKET DOOR PANEL 16 325 16 390 16 455 16 520 16 585 47 DOOR KNOB 90 210 2 2 2 2 2 48 8 32 X 1 4 H W H SCREW 90 211 2 2 2 2 2 49 VERTICAL JACKET CLIP 800341...

Страница 46: ...46 44 Figure 29 Exploded View Trim Control Components...

Страница 47: ...LY 3503107 1 1 1 RV12L PILOT REGULATOR NAT LP CSD 1 ONLY 3503115 1 1 1 900460 1 1 1 WIRE HARNESS ASSEMBLY CSD 1 ONLY 9605920 1 1 1 GAS VALVE HARNESS CSD 1 ONLY 9605900 1 1 1 ALARM HARNESS CSD 1 ONLY P...

Страница 48: ...48 PN 980416 S 1 6 0 6 0 4 Tel 215 535 8900 Fax 215 535 9736 www crownboiler com Manufacturer of Hydronic Heating Products P O Box 14818 3633 I Street Philadelphia PA 19134...

Отзывы: