![Crestron FT-PWR Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/crestron/ft-pwr/ft-pwr_operations-and-installation-manual_2683560011.webp)
Crestron
FT-PWR-B & FT-PWR-BALUM
FlipTop Power Center
Setup
Installation
There are two steps to installing the FT-PWR-B and FT-PWR-BALUM.
Cable Management Kit
The FT-PWR-B and FT-PWR-BALUM are shipped with a separate cable
management kit for organizing cables fed into the power center.
Tools required
•
Phillips screwdriver
•
Appropriate carpentry tools for cutout
Parts Supplied for Cable Management Kit
PART DESCRIPTION
QUANTITY
Cable Support Plate
1
Bushing 0.55 inch (1.40cm) ID, 0.80 inch (2.03 cm) OD
2
Bushing 0.39 inch (0.99 cm) ID, 0.64 inch (1.63 cm) OD
2
Bushing 0.31 inch (0.79 cm) ID, 0.50 inch (1.27 cm) OD
4
Screw 04-40, 0.25 inch (0.64 cm) L
4
The cable support plate should be installed before mounting the FT-PWR-B or
FT-PWR-BALUM to a surface. The cables are looped through the cable support
plate.
1. Place bushings on the cables you wish to install in the power center (eight
bushings supplied). Use bushings appropriate to the diameter of each cable.
2. Thread the cables through the cable support plate slots appropriate to the
size of the cable and the bushing you attached in the previous step.
3. Snap the bushings into the slots on the cable support plate.
4. Feed all excess cable through the opening.
5. Attach the cable support plate using the four 4-40 x ¼ LG screws.
6. If desired, any installed cables can be secured to the bottom bar with tie
wraps (not supplied).
Operations & Installation Guide – DOC. 6480
FlipTop Power Center: FT-PWR-B & FT-PWR-BALUM
•
7
Содержание FT-PWR
Страница 1: ...Crestron FT PWR B FT PWR BALUM FlipTopPowerCenter Operations Installation Guide...
Страница 4: ......