
13
FIGURE 8
STEPS & TIPS:
• Disconnect all power supplied to panel prior to servicing.
• Remove existing circuit breaker from control panel if rating is less than 20 AMPS.
• Install 20 AMP circuit breaker to control panel (Ordered separately)
• Rewire existing power supplied to control panel if required.
WIRE FEEDING THE PANEL NEEDS TO BE AT LEAST 12 GAUGE. (MAY NEED TO BE
LARGER DEPENDING UPON LENGTH OF RUN. CONSULT QUALIFIED ELECTRICIAN FOR
PROPER APPLICATION.
Optional Cicuit Breakers - Ordered Separately
PART NO.
DESCRIPTION
113291B
20 AMP, GE THQP Snap in Breaker
105476
20 AMP, DIN Rail Breaker
Содержание OGP2022CO Series
Страница 14: ...14 FIGURE 9 ...
Страница 16: ...16 Wiring for Optional Remote Alarm Light FIGURE 11 ...
Страница 20: ...20 FIGURE 16 EXPLODED VIEW FIXED DISCHARGE UPGRADE CORE ...
Страница 22: ...22 FIGURE 17 EXPLODED VIEW OGP SERIES ...
Страница 24: ...24 FIGURE 18 EXPLODED VIEW OGV SERIES ...
Страница 27: ...Notes ...
Страница 28: ...Notes ...