
24
Step 20: TIDY-UP & COVER INSTALLATION
• Coil, secure and loop the cords and harnesses to the harness hooks
• Fix any ruts or depressions, which may have occurred during installation.
• Check final grade, (page 19) so it does not interfere with station operation
STANDARD VENTED ROCK COVER INSTALLATION
The cover gasket is a large soft O-ring that is factory installed. Lube the O-ring lightly with the provided lube. Then
install the cover. The rock cover is secured with a twist lock mechanism. Rotate the rock cover clockwise (while
looking at top of cover). Insert lock thru the adapter lock hub and cover lock eye and lock. To remove, unlock rock
cover and turn counter-clockwise.
See APPENDIX 4 for OPTIONAL
Flood Plain Rock Cover Installation.
See APPENDIX 5 for OPTIONAL
Flat Cover Installation.
Содержание Barnes EcoTRAN
Страница 6: ...6 PACKAGED PARTS AS RECEIVED ...
Страница 10: ...10 STEP 4 SETTING THE BASIN Location Overview ...
Страница 11: ...11 STEP 5 RISER TANK PARTS ASSEMBLY ...
Страница 32: ...32 ...
Страница 34: ...Notes ...