
13
7B
Apply thread sealant to the threads of the NPT to SLIP fitting that is on the direct burial cable.
Thread and tighten the fitting into the adapter.
STEP 7: ADAPTER / CONDUIT LAYOUT
7A
Cut drain tile to proper elevation at bottom
of corrugation
• Optional Methods - Miter Saw or Sawzall®
IF EXTENSION IS REQUIRED
TO BRING DRAIN TILE ABOVE
GRADE LEVEL, USE CRANE
PUMPS & SYSTEMS’ DRAIN TILE
EXTENSION KIT P/N: 123510
Содержание Barnes EcoTRAN
Страница 6: ...6 PACKAGED PARTS AS RECEIVED ...
Страница 10: ...10 STEP 4 SETTING THE BASIN Location Overview ...
Страница 11: ...11 STEP 5 RISER TANK PARTS ASSEMBLY ...
Страница 32: ...32 ...
Страница 34: ...Notes ...