CP&S Control Panel Part No. and Brand
Number of pumps operated by control panel
NOTE:
At no time should holes be made in top of control panel, unless proper sealing devices are utilized.
Control Panel Manufactured by Others:
Company Name:
Model No.
Short Circuit Protection
Type:
Number and Size of Short Circuit Device(s)
Amp Rating
Overload Type
Size
Amp Rating
Do Protective Devices Comply with pump and motor Amp Rating
Are all connections tight?
Is the interior of the panel dry?
ELECTRICAL READINGS:
Single Phase:
Voltage supply at panel line connection, Pump Off, L1, L2
Voltage supply at panel line connection, Pump On, L1, L2
Amperage: Load connection, Pump On L1
L2
Three Phase:
Voltage supply at panel line connection, Pump Off, L1-L2
L2-L3
L3-L1
Voltage supply at panel line connection, Pump On, L1-L2
L2-L3
L3-L1
Amperage: Load connection, Pump On L1
L2
L3
FINAL CHECK:
Is pump seated on discharge properly?
Check for leaks?
Does check valves operate properly?
Flow; Does station appear to operate at proper rate?
Pump down time
Noise Level: High
Medium
Low
Comments:
Equipment Difficulties during start-up:
MANUALS:
Has operator received pump instructions and parts manual?
Has operator received electrical control panel diagram?
Has operator been briefed on Warranty?
Address of local CP&S Representative/Distributor:
I have received the above information (Name of Operator)
Name of Company
Date
I Certify this report to be accurate (Name of Start-Up Person)
Employed By:
Date
Date and Time of Start-Up
Present At Start-Up
( ) Engineer:
( ) Operator:
( ) Contractor:
( ) Other:
To be filled out by factory:
Start - Up form checked by:
Date warranty registration mailed: