START-UP REPORT
ENGINE DRIVEN
This report is designed to insure the customer that customer service and a quality product are the number one priority
with Crane Pumps & Systems, Inc. Please answer the following questions completely and as accurately as possible.
Mail this form to:
In U.S.A. Send To:
In Canada Send To:
CRANE PUMPS & SYSTEMS, INC.
CRANE PUMPS & SYSTEMS, INC.
ATTN: WARRANTY SERVICE GROUP
ATTN: SERVICE MANAGER
420 THIRD ST. / P.O. BOX 603
83 WEST DRIVE, BRAMPTON
PIQUA, OHIO 45356-0603 U.S.A.
ONTARIO, CANADA L6T 2J6
REPORTS THAT ARE NOT RETURNED CAN DELAY OR VOID WARRANTY.
Pump Owner’s Name:
Address:
Person in Charge of Pump:
Phone:
Purchased from (Crane Pumps & Systems Representative/Distributor)
Pumps Model & Brand:
Part Number:
Trailer type: Skid Mounted
Contractor Trailer
Highway Trailer
Other
Condition of Equipment:
Good
Fair
Poor
Condition of Trailer:
Good
Fair
Poor
Condition of Pump:
Good
Fair
Poor
Condition of Engine:
Good
Fair
Poor
Startup Checklist
BEFORE
Starting Engine:
Check/Add Engine Oil
Check/Add Fuel
Add liquid to pump case
Check automatic diaphragm type oiler reservoir oil level (Double Seals Only).
Check grease cup grease level (Single Seals Only).
Liquid Being Pumped:
Equipment difficulties during startup.
Manuals:
Has operator received pump instructions and parts manual?
Has operator been briefed on warranty?
Address of local Crane Pumps & Systems Representative/Distributor.
(over)
Manual Index
Содержание Barnes 2ADG8
Страница 8: ...Fig 1 8 Manual Index HOME MENU ...
Страница 9: ...Fig 2 9 Manual Index HOME MENU ...
Страница 10: ...Fig 3 10 Manual Index HOME MENU ...