Super Shot 125 Diesel Melter Part Manual
Chapter 5 Operating Instructions
©2017 by Crafco, Inc. All Rights Reserved………………..…………………………………..….Operating Instructions 5-6
Step
Action
9
Adjust the temperature dial to the manufacturer’s recommended temperature.
Note:
The hose reaches operating temperature in approximately 30 minutes.
10
After the hose reaches the temperature set point, the light in the control box marked
“HEATED HOSE” turns off.
11
Reduce the temperature to approximately 360°F (182.2°C).
Note:
We recommend that you run the hose at the suggested temperature setting.
Important:
The hose must reach 325°F (162.8°C) before dispensing can take place. If
the hose does not dispense when the trigger is activated, allow the material to heat
longer. If the hose still does not dispense, shut the machine down, locate and remove
the plug in the line.
CAUTION
DO NOT twist or kink the hose.
Avoid sharp bends and continuous twisting by maintaining a minimum 10-inch bend
radius.
DO NOT use a setting on the hose controller if more than 400°F.
DO NOT move or bend the hose when cold: it can cause damage to the hose.
DO NOT leave the hose cycling for longer than 30 minutes without dispensing material;
coking can occur and permanently damage the hose.
DO NOT remove the hose from the boom during operation or kinking will occur.
Important:
It is strongly recommended that the hose be stored in the boom (locked
position) when not in use or when in transit. This will prevent twisting or kinking.
Table 5-5 Starting the Burner for Electric Compressor (continued)
Содержание SUPER SHOT 125
Страница 1: ...Parts Manual 26631 Revision D SUPER SHOT 125 DIESEL MELTER ALL MODELS...
Страница 4: ...Super Shot 125 Diesel Melter PN 43600 Super Shot 125 Diesel Melter with Compressor 100 CFM PN 47400...
Страница 20: ......
Страница 24: ......
Страница 28: ......
Страница 64: ......
Страница 68: ......
Страница 224: ......
Страница 228: ......
Страница 229: ......
Страница 230: ...2017 Crafco Inc...