4.3.2.
Location of the boiler
4
Before mounting the boiler, decide on the ideal position for
mounting, bearing the Directives and the dimensions of the
appliance in mind.
4
When choosing the position for mounting the boiler, bear in mind
the authorised position of the combustion gas discharge outlets
and the air intake opening.
4
To ensure adequate accessibility to the appliance and facilitate
maintenance, leave enough space around the boiler.
WARNING
4
Fix the appliance to a solid wall capable of bearing
the weight of the appliance when full of water and fully
equipped.
4
It is forbidden to store inflammable products and
materials in the boiler room or close to the boiler,
even temporarily.
CAUTION
4
The boiler must be installed in a frost-free
environment.
4
An earthed electrical connection must be available
close to the boiler.
4
A connection to the mains drainage system for the
discharge of condensate must be available close to
the boiler.
4.3.3.
Ventilation
The installation must comply with BS 5540 (part 1 + 2), BS 6640 and
IGUP/10.
T002599-B
500
min.1000
500
min.
400
350
min.
250
750
Quinta Pro 30 - 45 - 65 - 90 - 115
4. Installation
250413 - 123157-03
17
Содержание Quinta Pro 115
Страница 7: ...250413 123157 03 5 ...
Страница 88: ...10 Checklists Quinta Pro 30 45 65 90 115 86 250413 123157 03 ...
Страница 89: ...Quinta Pro 30 45 65 90 115 10 Checklists 250413 123157 03 87 ...
Страница 90: ...10 Checklists Quinta Pro 30 45 65 90 115 88 250413 123157 03 ...
Страница 91: ......