
Mechanical Installation
17 / 79
Figure 3-5 Hole positions of mounting bracket
2.
Drill holes with a Ф12mm drill at the marked position, and then fasten
the mounting bracket
①
on the installation structure with six M10x50
hexagon combination screws
②
included in the PE accessory bag.
Tools required: 16mm hex socket wrench, torque: 12.5N.m,110 lbf-in.
Figure 3-6 Fasten the mounting bracket
3.
Position the inverter onto the mounting brackets by either of the two
ways.
A.
Lift mounting: screw two M10 lifting eyebolts to the studs at the
top of the inverter. Use sling rope or bar (inserted through both
lifting eyebolts) to lift the inverter onto the mounting bracket. The
minimum angle between the two sling ropes should be less than
90 degrees, as shown in Figure 3-7.
Содержание SCH275KTL-DO/US-800
Страница 40: ...APP Interface 40 79 Figure 6 7 Protection Parameters ...
Страница 47: ...APP Interface 47 79 Others In the others interface you can find following common parameters shown as below ...
Страница 57: ...APP Interface 57 79 Figure 6 20 History interface 6 4 4 Turn ON OFF Figure 6 21 Turn ON OFF interface ...