15
Maintenance
Engine:
The operation and life of the engine depends on you and your operator. Do not start
engine until the engine precheck is complete. The engine precheck consists of checking the oil,
the fuel level, the hydraulic oil level and the air filter. The M-1/M-2 Melter Applicator has the op-
tion of (2) different engines. The Isuzu 22.8 H.P. and 40.3 diesel units. For more detailed infor-
mation please refer to the Engine Operator Maintenance Manual and Warranty provided with
your Melter applicator.
NOTE: When breaking in a new Melter, we recommend running the engine for one
hour with no load prior to actual use on the job.
Air cleaner:
Due to the dusty conditions that can be created by road work, it is essential to
check the engine air cleaner element daily. Remove element and shake out the accumulated
dust and dirt. Wipe out dirt from inside cover and from housing. Check engine manual for
washing instructions. We recommend stocking replacement filters.
Fuel:
Use of high quality detergent oil of API (American Petroleum Institute) service class CC
or CD grade. Select the viscosity based on the air temperature at the time of operation. Check
your engine manual for other recommendations.
Burner:
There are several items that need to be inspected periodically on the burners. These
items include the burner nozzle, electrode and head position, chamber lining (see below) and
the electric eye. Please refer to the burner manual on how to perform each of these operations
in this manual..
After each 200 hours of operation, the chamber lining should be inspected. Remove (8) burner
mount securing bolts (A) and pull out burner and mount. Inspect lining (B) for excessive crack-
ing. Lining cracks are acceptable as long as they are not large enough to allow flame to contact
the combustion chamber walls.
(A)
(B)
Содержание Magma M1
Страница 7: ...7 Controls and Their Functions ...
Страница 9: ...9 Controls and Their Functions 1 2 3 4 5 6 7 8 9 10 11 ...
Страница 21: ...21 Parts Section ...
Страница 22: ...22 Complete Wiring Diagram Note Brake controller is required on vehicle to active the brakes on the trailer ...
Страница 23: ...23 Wiring Diagrams Engine Harness ...
Страница 24: ...24 Wiring Diagram Switch Plate ...
Страница 25: ...25 Wiring Diagram Switch Plate ...
Страница 26: ...26 Wiring Diagrams Main Supply Harness ...
Страница 27: ...27 Wiring Diagrams Burner ...
Страница 28: ...28 Hydraulic Schematic For Compressor Hydraulics see Supplement manual ...
Страница 31: ...31 Engine Components ...
Страница 32: ...32 Material Plumbing Components 155997 ...
Страница 33: ...33 Material Plumbing Components ...
Страница 34: ...34 Material Pump Parts List For Reference Only We do not stock rebuild parts 120803 20 GPM 154151 30 GPM ...
Страница 35: ...35 Material Pump Parts List For Reference Only We do not stock rebuild parts ...
Страница 36: ...36 Electrical Components ...
Страница 41: ...41 Combustion Chamber Parts List and Tank Insulation 404518 COMPLETE ASSEMBLY ITEMS 1 11 ...
Страница 43: ...43 Miscellaneous Parts ...
Страница 47: ...47 Notes ...
Страница 48: ...2601 Niagara Lane Plymouth MN 55447 763 557 1982 800 328 3874 Fax 763 557 1971 ...