background image

 

 

CXB2 

Mexico 

©  

 CPI 2016   

 

 

 

P/N# 253052002 

 

 

 

http://www.cranepi.com 

 

 

 

 

             

CXB2 

  

 

 

 

 

 

 

 

CXB2 Note Validator Installation Guide 

 

 

 

 

 

 

 

 

 

 

MEXICO 

 

 

 

 

 

     GENERAL INFORMATION 

The CXB2 Note Validator is designed to fit into the 
 standard note validator opening provided by the 
vending machine manufacturers.  It mounts on  
either the existing four mounting studs located in  
the machine or on the mounting bracket provided  
in various mounting kits. 

 

 

 

     Features of the CXB2 include:

 

  20, 50, 100, 200 & 500 Peso note acceptance 

  Fast note acceptance (1.7 seconds to stack) 

  Four Direction note acceptance 

  Re-programmable Flash Memory  

  Easy access to the note path even when mounted 

  Diagnostic LED (see top of unit) 

  Multi-Drop Bus (MDB), Vending Interface (24V)  

  Cassette  - 300, 400, or 600 Notes 

 

 

 

 

 

 

 

 

 

 

 

 

 

Revision  R1 

Содержание CXB2

Страница 1: ...ounts on either the existing four mounting studs located in the machine or on the mounting bracket provided in various mounting kits Features of the CXB2 include 20 50 100 200 500 Peso note acceptance...

Страница 2: ...http www cranepi com Major Parts Description MDB Harness OPT HS CXB MDB2 Rev D Main Body Assembly SM17 00 000 Vault Assembly BX17 00 000 10 Cassette Lower Guide Assembly SM17 21 000 16 Pin Connector...

Страница 3: ...verride the above options and the Note Validator will operate according to switch settings defined in the chart below See Figure 2 2 Set note validator switches to desired settings DIP SWITCHES Mexico...

Страница 4: ...nnect the CXB2 to the supplied interface harness Install the 16 pin connector into the interface slot See Figure 4 Caution Do not force the plug into note validator This may cause pins to bend or brea...

Страница 5: ...move the notes and check the status Instructions for cassette removal are on the label at the back of the magazine Once the magazine is installed verify that the LED status indicator remains BLUE and...

Страница 6: ...LED is steady ON remove the programming stick Cycle the power CX B 1 1 3 4 R 0 Product family name CX B for Bill stacker Electronic platform 1 Standard MDB Bill path width 1 71mm 2 73mm Drop Box capa...

Страница 7: ...he Note Cassette is removed or the power is turned off SET BRIGHTNESS OF BEZEL BLUE RUNNING LIGHTS Turn OFF power to the validator Switch the unit to Service Mode SW 8 is ON and reapply power Press th...

Страница 8: ...re are two ways to retrieve diagnostic information 1 Diagnostic LED Observe blue Diagnostic LED It will flash to indicate the problem per the diagnostic table below 2 Bezel LEDS When the Bezel LEDS ar...

Страница 9: ...upplied to the note validator Steady ON Red 2 chevron bars Comm disabled from mech VMC Note Refer to the diagnostics chart on page 9 and to figure 7 1 Must have product in the vending machine Check co...

Страница 10: ...ck Cassette is full 4 red on black Failure of the Stacker mechanism 5 red on black Failure of the Discrete bill path sensors 6 red on black Failure of the Optical Array sensor 7 red on black Failure o...

Страница 11: ...CXB2 Mexico 11 CPI 2016 P N 253052002 http www cranepi com Figure 9 Figure 10 cut out area 4 threaded studs 8 32 hight 0 5 Location of threaded studs...

Страница 12: ...CXB2 Mexico 12 CPI 2016 P N 253052002 http www cranepi com...

Страница 13: ...ublication may be copied transmitted transcribed or distributed in any form or by any means or stored in a database or retrieval system or translated into any language natural or computer without the...

Отзывы:

Похожие инструкции для CXB2