
ChargePoint® Charging Stations
2-12
Step 11 - Install top cover
Place the top cover over the mounting box
and fasten to both sides using the two
supplied security screws, as shown.
The top cover includes four pre-drilled
holes. These holes allow a sign to be
installed on top of the D-Stand. If installing
a sign, refer to the hole pattern
measurements provided below. If you are
not installing a sign, insert the four
supplied Phillips screws into the pre-drilled
holes.
TOP COVER HOLE PATTERN (not to scale)
10” (254 mm)
2” (51 mm)
#10 - 32 THREAD HOLE
.28” FULL THREAD DEPTH