© Corroventa Ltd.
2017.02
8 (25)
Installation
The CTR T ES shall be placed and installed leveled and in a stable position so that it does not fall over
and cause damage to the machine itself, person or property.
For suction drying, a water separator shall be used and connected to the hose prior to the turbine so
that water is not sucked into the turbine as that will damage the motor.
For pressure drying it is important to verify that the capacity of the turbine does not exceed that of
the dryer, that the latter’s dry air volume matches the turbine’s throughput. If not, too much air will
be drawn through the dryer and its capacity will decrease dramatically. If using a CTR ES version
dryer, this is verified by observing that the wet air volume is correct. When using one of these
machines, there is also the possibility of networking them, using the turbine as Master, and setting
the slaved adsorption dryer to pressure drying mode. In this mode, the dryer will automatically adjust
to the air volume that the turbine is pushing.
Verify that the cooling air filter is clean and not clogged by dirt. If required, replace the filter before
the work is commenced.
Contrary to its predecessors, the CTR T ES is not equipped with a manually resettable overheating
protection as this no longer is necessary. The turbine provides itself with cooling air and prevents
overheating by automatically adjusting its speed if the temperature should still rise too high. For best
drying performance, the user should however still verify that the airflow through the construction to
be dried is correct.
Installation in short, main points:
1.
Put the turbine in a leveled and stable position so that it does not fall over and cause
damage.
2.
Check the process air filter and the cooling air filters and replace them if necessary. Connect
the hoses configured for the drying to be undertaken. If free water might be present in the
construction to be dried, use Water separator to prevent water from being sucked into the
turbine.
3.
Connect the cable to a 1-phase, 230 VAC socket with a 10A or maximum 16A fuse. As the
machine is normally used in humid or wet spaces, the use of a ground fault circuit interrupter
is strongly recommended.
4.
Put the power switch in position On. When the display has started up, for new job with
default settings, push Start. To operate with the same settings as last time the machine was
used, push Resume.
5.
Adjust the speed until desired air flow is obtained.
Содержание T2 ES
Страница 1: ...T2 ES T4 ES TURBINES USER MANUAL ...
Страница 2: ......
Страница 23: ...Interface Map for CTR A2ES CTR A4 ES and CTR A ES Top Menu ...
Страница 24: ...Sublevels Info Statistics Info Info Info Reset Reset Info ...
Страница 26: ...Create Activate Activate Deactivate OK Edit ...
Страница 27: ...Info Change ...