background image

Enduro Ice/Beverage Dispenser Operator’s Manual

3

620916502OPR

START--UP AND OPERATING INSTRUCTIONS

Fill the hopper with ice and replace the lid. Allow 10 to 15 minutes for the cold plate to cool down. Repeat this pro-

cedure whenever the dispenser has been standing overnight or other long periods without ice use. Start up the

beverage system and adjust faucets to the proper brix. Contact your local syrup distributor for complete informa-

tion on the beverage system.

To dispense ice, hold cup under ice chute and press the appropriate size button on the ice portion control located

above the ice chute. An extra ice portion may be obtained by pressing the increase key before pressing the button.

For beverage dispensing, place a cup on the cup rest against the faucet lever of the desired flavor. Beverage is dis-

pensed automatically, filling the cup and shutting off. A delay feature is provided in the faucet controller to “top--off”

the drink after shut off.

Maximum and minimum ambient temperature rating for correct operation 40 to 105

d

F.

CAUTION:

Use caution to avoid spilling ice when filling dispenser. Clean up

immediately any spilled ice from filling or operating the unit. To prevent

contamination of ice, the lid must be installed at the unit at all times.

CONTROLS AND ELECTRICAL

Portion Control Panel

The portion control panel on the Pro ED Fast Gate has several functions including dispensing 4 programmed ice

portions for 4 cup sizes, programming, and cleaning. The portion control panel and its functionality are described

in the following illustration:

Press for extra

ice, then press

cup size

LIGHT

Indicates mode of

operation or amount

of adjustment

DECREASE

CUP SIZE

INCREASE

Small, Medium, Large or X--Large Cup Size

Содержание Enduro ED-250 BCP

Страница 1: ...BCP IMI CORNELIUS INC 2005 2009 www cornelius com Part No 620916502OPR June 7 1999 Revised April 15 2009 Revision B Control Code B THIS DOCUMENT CONTAINS IMPORTANT INFORMATION This Manual must be read...

Страница 2: ...CONTROLS AND ELECTRICAL 2 PORTION CONTROL PANEL OPERATIONS 3 ICE PORTION CONTROL SETUP AND ADJUSTMENT PROCEDURE 3 MAINTENANCE 5 DAILY OR AS REQUIRED 5 WEEKLY OR AS REQUIRED 5 MONTHLY 5 CLEANING INSTR...

Страница 3: ...use the controls properly Do not let anyone operate the machine without instructions Keep your machine in proper working condition Unauthorized modifications to the machine may impair function and or...

Страница 4: ...LDER PANEL LID STRAW HOLDER BEVERAGE FAUCET ON OFF SWITCH ICE PORTION CONTROL MODULE MANUAL AUTO ICE TOGGLE SWITCH MANUAL ICE DISPENSE RED PUSH BUTTON SWITCH DRIP TRAY CUP REST LOWER ACCESS PANEL BEVE...

Страница 5: ...aucet lever of the desired flavor Beverage is dis pensed automatically filling the cup and shutting off A delay feature is provided in the faucet controller to top off the drink after shut off Maximum...

Страница 6: ...minute or INCREASE and DE CREASE can simultaneously pressed 3 times ICE PORTION CONTROL SETUP AND ADJUSTMENT PROCEDURE Light Color Explanation Actions That Can Be Taken Step 1 Fill the Ice Chute Yello...

Страница 7: ...ZE again To exit Portion Adjustment Mode si multaneously press INCREASE and DECREASE two times Step 3 If desired set the extra ice portion adjustment Red Extra Ice Portion Adjust ment To enter Portion...

Страница 8: ...ACES IMPORTANT Perform the following daily A Remove the cup rest from drip tray B Wash the drip tray with soap solution Rinse with clean water and allow solution to run down the drain C Wash cup rest...

Страница 9: ...iner and lid with the soap solution Thoroughly rinse with clean potable water Reassemble the agitator and retainer in the hopper Make sure that the retainer is secured tightly turn clockwise to screw...

Страница 10: ...repare cleaning tank by filling clean five 5 gallon tank with a mixture of mild detergent and 120dF potable water 6 Connect a gas disconnect to the tank and then apply one of the product tubes to the...

Страница 11: ...nect 7 Place all the BIB disconnects into the pail of sanitizing solution Operate all the valves until the sanitizing solution is flowing from the valve Allow sanitizer to remain in lines for fifteen...

Страница 12: ...l unit C Poor ice quality due to water quality or ice maker problems C Install water filter system For Icemaker problems consult icemaker manual D Improper use of flaked ice D Replaced flaked ice with...

Страница 13: ...troller J Replace cylinder K Replace solenoid valve L Red wire should be connected to terminal no 3 of relay coil M Replace relay N Replace defective component NO ICE DISPENSED FROM MANUAL ICE DISPENS...

Страница 14: ...5 21 593 1829 ENGLAND D TYTHING ROAD ALCESTER D WARWICKSHIRE B49 6 EU ENGLAND D 44 789 763 101 D FAX 44 789 763 644 FRANCE D 71 ROUTE DE ST DENIS D F 95170 DEUIL LA BARRE D PARIS FRANCE D 33 1 34 28 6...

Страница 15: ...IMI CORNELIUS INC...

Отзывы: