background image

1

Extend Shelter Frame

CAUTION:

 Avoid pinch points 

when opening or closing 

the shelter frame.
• Expand and spread out

  SHELTER FRAME 

  halfway.

4

Telescoping Steel Frame Legs

 

6

Secure Shelter

∙ Locate FOOT at the bottom of  

  each SHELTER LEG POLE (4 total).
• Slide STAKE through HOLE at each location (fig. 6).
• Locate GUYLINES attached to the shelter and unroll.
• Slide STAKE through loop at each location, extend out and drive in to secure (fig 7).

  NOTE: 

Extend four corner GUYLINES out at a 45º angle from shelter.

• Adjust GUYLINES as needed by adjusting the SLIDER up the cord.

 

Model #40147

Carry Bag (91742)

Canopy Top (91741)

Stakes (90014)

x 8

Contents & Repair Parts

8x8 Instant Canopy

8ft x 8ft x 107in

2 People

Rubber Mallet

Level Area

We Recommend...

(continued on back)

Need some help?

1-888-775-5628

coreequipment.com

Attach Canopy

∙ Unfold CANOPY TOP then drape over SHELTER FRAME with corners

  positioned over SHELTER LEGS.
∙ Locate HOOK & LOOP FASTENER on underside of the corner 

  of the CANOPY TOP; then attach to material located at the top of the 

  STEEL SHELTER LEG (fig. 1).
• Repeat for remaining 3 corners of the CANOPY TOP.

Raising Roof Support Brackets

∙ To finish expanding the frame, grasp the LEG POLE and push up 

  on the ROOF SUPPORT BRACKET until the GREEN BUTTON “clicks”  

  into locked position (fig. 2).
• Repeat for remaining 3 ROOF SUPPORT BRACKETS to fully raise   

  the ROOF PEAK.

3

2

 

∙ Place foot on the LEG FOOT; then grasp and extend TELESCOPING

  LEG POLE until the METAL PUSH PIN “clicks” into locked position (fig. 3).
• Repeat for remaining 3 LEG POLES.

                                                      NOTE:

 When telescoping the legs, the 

                                                                     METAL PUSH PIN will lock in the lowest 

                                                                               setting first. Push in the METAL

                                                                                       PUSH PIN and extend the leg

                                                                                                further to desired shelter

                                                                                                        height (fig. 4).

5

Secure Canopy to Frame

∙ Locate HOOK & LOOP FASTENERS along the 

  seam of the underside of the CANOPY TOP; then 

  wrap around METAL BRACKET to secure (fig. 5).
• Repeat for remaining 3 sides of the shelter 

  CANOPY TOP.
• Position the shelter in its 

  final position before 

  securing with 

  stakes and 

  guylines.

 

 

fig. 1

fig. 5

fig. 6

fig. 1

fig. 2

fig. 7

Apex Support Pole

(91739)

Lower 

Roof Pole

(91737)

Upper Roof Pole

(91736)

Center Hub

(91738)

Gazebo

Leg

(91740)

Scissor Pole 

A (91734)

B (91735)

fig. 3

fig. 4

3-Stage Height

Adjustability

LOW

HIGH

MEDIUM

METAL

PUSH

PIN

Отзывы: