Hydro Box of C
H
V5 Home Installation and Operation Manual
23
the hydro box, and then insert it into the lower water temperature sensor port at the lower
part of water tank. Connect the upper water temperature sensor included on water tank
(i.e. upper temperature sensor port in the middle of water tank) to the red connector
leading out from the terminal box on hydro box. Then, put it into electric box.
(4) Tighten the strong current cables with cable clamp and cover up the electric box.
(5) The wired controller shall be fixed properly. The communication wires from wired controller
and hydro box shall be correctly connected.
(6) Take care to route the strong current cables separately from the light current cables.
Note: The wiring diagram above is only for reference. Please refer to the one stuck inside the
electric box.
3.3 Confirm DIP Switch of Main board
Confirm the S
1
and S
2
DIP switch on the main board of hydro box. S
1
DIP means capacity DIP
switch. S
2
DIP means function DIP.
3.3.1 Capacity DIP(S
1
) of Hydro Box
Capacity DIP switch S
1
is 5 bit. Please do not change it.
Capacity of hydro box
Capacity DIP switch
Model DIP switch
1
2
3
4
5
16
ON OFF OFF ON
OFF
Note:
①
DIP switch shall be set correctly and cannot be set in the middle position. When the
switch is set to
“ON”, it means “0”; when the switch is set to the opposite direction of
“ON”, it means “1”.
Example: S
1
is as shown in the following figure:
Содержание HB16NK
Страница 11: ...Hydro Box of CHV5 Home Installation and Operation Manual 8 Installation steps ...
Страница 20: ...Hydro Box of CHV5 Home Installation and Operation Manual 17 ...
Страница 23: ...Hydro Box of CHV5 Home Installation and Operation Manual 20 ...
Страница 24: ...Hydro Box of CHV5 Home Installation and Operation Manual 21 ...
Страница 33: ......