
Cool Boss Evaporative Air Cooler
13
P/N 5900271 — June 2022 — Rev. A4
Setup
There are six basic steps in the Cool Boss set up.
1.
Unbox.
2.
Install the Casters.
3.
Install the Media.
4.
Determine the Cool Boss location.
5.
Fill the reservoir or connect to water.
6.
Connect to power.
Tools required for Assembly:
•
Hammer
•
Pry Bar
•
Phillips Screwdrivers
•
Metric Open End Wrench Set
•
Two (2) AAA 1.5 V Batteries
Unboxing the Cool Boss
The Cool Boss Cooler is carefully packaged to prevent damage. Exercise care in removing the Cooler
from its packaging.
⚠
WARNING
Be careful not to injure yourself on sharp edges or fasteners.
⚠
WARNING
You must wear the proper protective equipment at all times during setup and
assembly of this Cooler: leather gloves, steel-toed boots, and back belts.
To unbox the Cooler
:
Use a hammer and pry bar to
carefully
remove the shipping container from around the Cool
Boss.
Position the Cooler with its back side down to provide access to the bottom of the unit. The back
of the shipping container may be used to provide a clear, clean area to work on the Cooler. See
figure below.
Содержание CB-16H
Страница 7: ...Cool Boss Evaporative Air Cooler 7 P N 5900271 June 2022 Rev A4 Specifications ...
Страница 36: ...Cool Boss Evaporative Air Cooler 36 P N 5900271 June 2022 Rev A4 Labels ...
Страница 37: ...Cool Boss Evaporative Air Cooler 37 P N 5900271 May 2022 Rev A4 ...
Страница 38: ...Cool Boss Evaporative Air Cooler 38 P N 5900271 May 2022 Rev A4 ...
Страница 39: ...Cool Boss Evaporative Air Cooler 39 P N 5900271 May 2022 Rev A4 Maintenance Log ...
Страница 40: ...5240 Willis Rd Theodore AL 36582 USA 2022 BendPak Inc All rights reserved coolboss com ...