Conquip Trench Box Скачать руководство пользователя страница 1

User Guide

Trench Box

Содержание Trench Box

Страница 1: ...User Guide Trench Box...

Страница 2: ...nto place The Trench Box is normally selected for installing utility pipes where ground movement is not critical The size of the system required depends on maximum trench depth requirements and the si...

Страница 3: ...External Length Internal Length TL101 00003 2560mm 3500mm 3100mm TL101 00004 1310mm 3500mm 3100mm 1 Weight will be equal to or less than the weight stated depending on your strut configuration Produc...

Страница 4: ...Parts Diagram Trench Extension Box NOTE These parts are for this model they may differ for previous versions Please contact Conquip with any queries NOTE These parts are for this model they may diffe...

Страница 5: ...nd secure with 40mm pins and R clips 4 Lower the pre assembled struts onto the rocker assemblies securing the struts to the panel brackets using pins and R clips 5 Connect the 4 remaining rocker assem...

Страница 6: ...ox into the Trench 3 The excavator operator digs progressively between the two faces of the box panels 4 The rocker assemblies allow vertical and horizontal movement when the force from the bucket is...

Страница 7: ...tension box 2 Attach a certified lifting chain to one of the top lifting points on the extension box 3 Slowly lift the corner of the extension box 4 Repeat this process for each lifting point in turn...

Страница 8: ...he top lifting points of the extension box and lowering it on its side 13 Remove the R clips pins and the connectors from the base box 14 Backfill the trench and extract the base box using the same me...

Страница 9: ...ce Do not operate this equipment near overhead power lines Take care in confined spaces near ceilings or similar hazards This equipment was designed for vertical lifting Do not drag or swing Before op...

Страница 10: ...tions involving drilling welding cutting or distortion of materials in any form are to be carried out on the product Conquip Engineering Group must provide full written approval prior to the work bein...

Страница 11: ...ave read this User Guide and must be properly briefed You must be competent alert and medically fit when using this equipment If you have a medical condition a mental or physical disability you must s...

Отзывы: