NOTE:
The service life of the Conel Stream is highly dependent on the water quality.
Inspections may be carried out independently or by professional/knowledgeable
personnel or by the manufacturer;
Maintenance and repairs may only be carried out by professional and knowledgeable
personnel or by the manufacturer.
This professional shall have read and understood this operating manual;
The notes and periods in the table are indicative and must be adapted to the respecti-
ve local and outdoor environments.
Plant part/de-
vice
Measure
Implementation
Period
Filter
Inspection
Control of the condition
approx. 1 year
Maintenance
Cleaning the filter
approx. 1 year
Pump
Inspection
Visual check for function and tightness
approx. 6 months
Maintenance Rehearsal:
¾
Before, during or after the test run,
check:
¾
The electrical protection of the system in
accordance with VDE regulations
¾
Preprint of the MAG (if available)
¾
Tightness of the pump‘s sliding ring seal
¾
Function of the setback preventer
¾
Pump and flow noise
¾
Tightness of the system and fittings
¾
Cleanliness of the plant
¾
Corrosion of plant parts
approx. 1year
Drinking water
re-feeding
Inspection
Check of the safety distance (water level
adjustment), the inlet valve and the overflow
when the inlet is fully open
approx. 1year
Pipelines
Inspection
Check all visible cables for condition, tight-
ness, fastening and external corrosion
approx. 1year
Wastewater
lifting plant
(if available)
Inspection
Testing for operational capability, tightness,
external corrosion
approx. 1 months
Maintenance Check for tightness, function, control of
level switching, adjusting heights of on, off
and alarm level check, control of the reflux
preventer for tightness
approx. 6 months
Removal valves
Inspection
Checking all removal valves for tightness
and possible changes in water, odor, paint or
suspended matter.
approx. 1year
Rinsing equip-
ment
(Toilets)
Inspection
Examination of the rinsing process of rinsing
devices (flushing boxes, press sinks), if
necessary correction of the rinsing water
volume.
approx. 1 year
Marking
Inspection
Testing of the marking of all pipelines and
sampling points
approx. 1 year
Содержание KBN COSSTS5
Страница 1: ...1 TRINKWASSERTRENNSTATION DRINKING WATER SPLITTING STATION D GB STREAM...
Страница 2: ...2...
Страница 3: ...3 Technische nderungen vorbehalten F r Druckfehler wird keine Haftung bernommen...
Страница 41: ...41...
Страница 78: ...78...
Страница 79: ...79...