7
Commissioning
7.1
Safety
Personnel:
The conductor rail system must only be commissioned and operated for the first time after a repair by qualified electricians!
The qualified electricians must meet the requirements described in Section 2.2.1.
Required protective equipment:
Requirement:
WARNING!
Only operate the conductor rail system in areas inaccessible to the public!
Operation is only permitted in areas inaccessible to the public and out of manual reach.
→
The danger zone must be enclosed by the customer or protection ensured by distance!
WARNING!
Risk of injury due to improper commissioning!
Improperly performed commissioning can lead to dangerous situations for personnel (see Section
7.2.1).
→
Before commissioning, carry out the inspections on the inspection list of the manufacturer.
→
Always measure the insulation resistance before commissioning the system. This must be con-
ducted in compliance with the local technical standards, guidelines and legislation.
→
Always ensure that all of the assembly and installation work has been fully completed before com-
missioning the system.
→
Always ensure that all of the components have been properly installed before commissioning the
system.