![Conductix-Wampfler SingleFlexLine Program 0815 Скачать руководство пользователя страница 86](http://html1.mh-extra.com/html/conductix-wampfler/singleflexline-program-0815/singleflexline-program-0815_operating-instructions-manual_2651969086.webp)
Operating Instructions
Single-pole Conductor Rail System
SingleFlexLine Program 0815
BAL0815-0002g-US
www.conductix.us
translated document
page 86 of 128
6.3.3.8
Mounting end caps and end line feeds
NOTE!
To allow the mounting of the end caps, a clearance of 110 mm from the beginning of the guideway
profile must be maintained at the full height!
(see
Fig. 114
)
Drill the guideway profile in accordance with the layout and allocation plan. The use of a drilling jig is recommended in order to ensure
the exact position of the end caps. The drilling jig can be used both for straight transfers (e.g., entry into a lifter) and for angled cuts
(e.g., switches). For further information see MV0815-0006.
For further information see MV0815-0006!
Fig. 114: Clearance for mounting the
end caps
Fig. 115: Drilling jig (Order No.: 08-V015-0474)
Fig. 116: Screw on the retaining plate
Tools:
Self-tapping screws DIN 7500-1 M4, length
≙
profile bar width
Drill diam. 3.6 mm
Crimping tool
After installation of the end cap bar (existing systems) or the retaining plate (new systems) for the transfer caps, the end caps (with
or without line feed) are installed.
CAUTION!
Ensure the correct positioning of the clamping unit!
Slide the clamping unit of the end cap into the conductor rail so that the contact part sits in the
interior of the conductor rail and the clamping part engages between the conductor rail and the
rear insulation (see Fig. 117 and Fig. 118).