
24
Safe-Lec 2 Conductor Bar Manual
SECTION 12 - LOW AMP JOINT POWERFEED ASSEMBLY
NOTE
• Installation up to 100 Amp.
Tools Needed
• 10mm A/F Wrench
• Suitable Sharp Knife
• Cable Stripper
• Cable Crimping Tool
• Suitable Cable Terminal (see list of recommended suppliers and references).
Low Amp Joint Powerfeed Installation
1. Remove black plug on powerfeed cap.
2. Assemble joint to conductor bar as described previously.
3. Pass supply cable through grommet.
4. Crimp terminal to supply cable.
5. Secure terminal to joint using washer and nut and tighten nut to a recommended torque of 8 Nm (5-6 ft-lbs).
6. Fit powerfeed cap over assembly (ensure the cable is threaded carefully through grommet).
7. Once in position close flaps and ensure flaps click home.
NOTE
• Joint must not support the cable.
• Max cable size 10sq. mm pvc 600/1000V stranded copper conductor (#8 AWG Extra Flexible).
Figure 24-1
1. Washer
2. Nut
3. Powerfeed Cap
1
3
2