6
Note: For putting the Condair GS/GS...OC into operation and out of operation please follow the
procedures described in the chapters 7. and 7.4 of the installation, commissioning and service
instructions for the Condair GS/Condair GS...OC.
•
Switching on the Condair GS/Condair GS...OC
:
• Switch on the external service switch in the power supply line.
• Switch on the unit via the unit switch.
The control carries out a
system and level test
, during which all the LEDs
light up.
If a failure occurs on the system test, a corresponding error message is
shown in the display.
After the system test the unit is in
normal operation mode
. The display shows
the
standard operating display
(first page of the indication level).
Note: The contents of the standard operating display depends on the ac-
tual operating status and on the configuration of the Condair GS/Condair
GS...OC and can differ from the opposite display.
2.2
Switching on and off the Condair GS/Condair GS...OC
Condair GS 240
START UP
Menu
Condair GS 240
Standby
03.03.2009 12.00.00
•
Switching off the Condair GS/Condair GS...OC
:
• Switch off the unit via the unit switch. The display goes out.
• Switch off the external service switch in the power supply line.
Menu
Condair GS 240
Stanby
03.03.2009 12.00.00
2.3
Operating of the operating and display unit
The operating and display unit is operated via the four keys located
just below the display. The 4 status fields at the bottom of the display
show the active keys the functions assigned to them.
actual key settings
keys